Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/6/2023 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-06230
JOB ADDRESS:
12357 DIAMOND CREEK DR
FRISCO, 75035
DESC:   4998 AC, 5888 SF, 2 STORY
OWNER:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100
Grapevine TX 76051

CONTRACTOR:
TOLL BROTHERS INC (GEN)
2555 SW Grapevine Pkwy, Suite 100
Grapevine TX 76051
ISSUED DATE:
1/6/2023
APPLIED DATE:
1/6/2023
EXPIRED DATE:
2/6/2024
SITE APN:
ADD279106
STATUS:
COMPLETED
APPLICANT:
Terah Montague
2555 SW Grapevine Pkwy #100
Grapevine TX 76051
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
PLAN REVIEW FEE$50.00
FLATWORK RES 08/04/2023 DW2$30.00
ELECT FINAL RES 06/09/2023 DWF$30.00
CO AND BUILD FINAL 07/18/2023 DWF$30.00
PERCENT CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PTO AND MECH ROUGH 03/24/2023 MLM$30.00
PTO AND MECH ROUGH 03/30/2023 MLM$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,972.52
RESIDENTIAL FEE$176.64
RESIDENTIAL MECHANICAL FEE$185.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$328.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,133.00
AUTO PROCESSING FEE$144.19
GAS RELEASE 06/09/2023 SDC$30.00
PLUMB MECH FINAL 07/12/2023 SDC$30.00
Total Fees:$8,486.05
______  METER PAYMENT
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  SHEATHING RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  LATH RES
______  DRYWALL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  ELECT FINAL RES
______  FLATWORK RES
______  GAS RELEASE
______  TREE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  TREE
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  FLATWORK RES
______  FLATWORK RES
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)