|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/8/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-06002
|
JOB ADDRESS: 16098 GARGANEY CT FRISCO, 75035 |
DESC:
3748 AC, 4504 SF, 2 STORY |
|
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 12/8/2022
APPLIED DATE:12/8/2022
EXPIRED DATE:6/24/2024
SITE APN:ADD281114
STATUS:COMPLETED
|
|
APPLICANT:
Sonny Buenteo
5601 Democracy Drive Suite# 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
PTO AND MECH ROUGH 07/18/2023 DOT | $30.00 |
2NDS AND FRAMING 07/20/2023 DP2 | $30.00 |
2NDS AND FRAMING 07/28/2023 DP2 | $30.00 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $2.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $8.20 |
PERCENT CREDIT CARD FEE | $1.80 |
2NDS AND FRAMING 08/02/2023 GLQ | $30.00 |
DRYWALL RES 08/25/2023 GLQ | $30.00 |
PLUMB MECH FINAL 12/19/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,536.44 |
RESIDENTIAL FEE | $133.26 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $306.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $111.82 |
T-POLE RES 04/06/2023 RWK | $30.00 |
FLATWORK RES 04/27/2023 RWK | $30.00 |
PLUMB MECH FINAL 12/07/2023 SMH | $30.00 |
PLUMB MECH FINAL 12/14/2023 SMH | $30.00 |
UTILITIES INSPECTION 11/21/2023 TL | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
Total Fees: | $7,488.02 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|