|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/1/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-05755
|
JOB ADDRESS: 16101 HARRIS HAWK ST FRISCO, 75035 |
DESC:
3428 AC, 4105 SF, 2 STORY |
|
|
CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD LEWISVILLE TX 75056
|
ISSUED DATE: 12/1/2022
APPLIED DATE:11/18/2022
EXPIRED DATE:12/18/2023
SITE APN:ADD281175
STATUS:COMPLETED
|
|
APPLICANT:
Liliana Moton
4400 State Highway 121 Lewisville TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 12/30/2022 DC2 | $30.00 |
2NDS AND FRAMING 02/28/2023 DW2 | $30.00 |
2NDS AND FRAMING 03/01/2023 DW2 | $30.00 |
2NDS AND FRAMING 03/02/2023 DW2 | $30.00 |
2NDS AND FRAMING 03/15/2023 DW2 | $30.00 |
2NDS AND FRAMING 03/17/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $2.00 |
SET 1 PD METER 12/05/2022 JRC | $100.00 |
PTO AND MECH ROUGH 02/13/2023 JWE2 | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,428.60 |
RESIDENTIAL FEE | $123.15 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $257.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
WATER IMPACT FEE | $2,120.00 |
DRYWALL RES 04/05/2023 RWK | $30.00 |
PTO AND MECH ROUGH 01/30/2023 SME2 | $30.00 |
UTILITIES INSPECTION 06/06/2023 TL | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $6,746.65 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|