BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/28/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-05747
|
JOB ADDRESS: 16858 MAPLE BEND DR FRISCO, TX 75035 |
DESC:
3031 AC, 3570 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
BEAZER HOMES
1501 LBJ FREEWAY #300 FARMERS BRANCH TX 75234
|
ISSUED DATE: 11/28/2022
APPLIED DATE:11/21/2022
EXPIRED DATE:12/11/2023
SITE APN:ADD269988
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Allen
1501 LBJ Freeway Suite 300 Dallas TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE RES 01/19/2023 DWF | $30.00 |
DRYWALL RES 04/06/2023 DWF | $30.00 |
BRICKWALL TIES RES 04/12/2023 DWF | $30.00 |
FLATWORK RES 05/01/2023 DWF | $30.00 |
FLATWORK RES 05/02/2023 DWF | $30.00 |
FLATWORK RES 05/04/2023 DWF | $30.00 |
FLATWORK RES 05/05/2023 DWF | $30.00 |
FLATWORK RES 05/08/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $9.40 |
BRICKWALL TIES RES 04/11/2023 JR2 | $30.00 |
PLUMBING ROUGH-IN 01/03/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,253.10 |
RESIDENTIAL FEE | $107.10 |
RESIDENTIAL MECHANICAL FEE | $133.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $227.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
SLAB RES 01/13/2023 RWT | $30.00 |
SLAB RES 01/17/2023 RWT | $30.00 |
PLUMBING ROUGH-IN 12/22/2022 SMH | $30.00 |
UTILITIES INSPECTION 06/07/2023 TL | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $10,394.60 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ T-POLE RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ T-POLE RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|