|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/8/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-05501
|
JOB ADDRESS: 16272 HUNTERS GLEN LN FRISCO, TX 75033 |
DESC:
3877 AC, 4814 SF, 2 STORY |
|
OWNER:
WINDSOR HOMES CUMBERLAND LLC
DALLAS TX 75225
|
CONTRACTOR:
WINDSOR HOMES
5310 Harvest Hill Rd 162 Dallas TX 75230
|
ISSUED DATE: 11/8/2022
APPLIED DATE:11/2/2022
EXPIRED DATE:4/20/2024
SITE APN:ADD298780
STATUS:COMPLETED
|
|
APPLICANT:
Amber Davis
5310 Harvest Hill Rd 162 Dallas TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECT FINAL RES 08/04/2023 DC2 | $30.00 |
ELECT ROUGH RES 08/09/2023 DC2 | $30.00 |
SLAB RES 12/28/2022 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
SET 1 PD METER 12/06/2022 ZM | $100.00 |
2NDS AND FRAMING 05/05/2023 JDR | $30.00 |
DRYWALL RES 05/30/2023 JDR | $30.00 |
PLUMB MECH FINAL 09/07/2023 JR2 | $30.00 |
SET 1 PD METER 11/16/2022 JRC | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,652.34 |
RESIDENTIAL FEE | $144.42 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $4,257.00 |
WATER IMPACT FEE | $2,176.00 |
AUTO PROCESSING FEE | $82.47 |
GAS RELEASE 08/09/2023 SME2 | $30.00 |
PLUMB MECH FINAL 09/06/2023 SME2 | $30.00 |
PLUMB MECH FINAL 09/12/2023 SME2 | $30.00 |
PLUMB MECH FINAL 09/20/2023 SME2 | $30.00 |
UTILITIES INSPECTION 09/07/2023 TL | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
Total Fees: | $12,896.03 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT ROUGH RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PIER RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|