|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/26/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-04634
|
JOB ADDRESS: 16443 MAPLE BEND DR FRISCO, TX 75035 |
DESC:
3113 AC, 3830 SF, 2 STORY |
|
OWNER:
TEXAS LLC MATTAMY
1800 VALLEY VIEW LN STE 480 DALLAS TX 75234-8985
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittington Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 9/26/2022
APPLIED DATE:9/26/2022
EXPIRED DATE:9/18/2024
SITE APN:ADD269958
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $540.00 |
WATER METER DEPOSIT | $150.00 |
2NDS AND FRAMING 10/09/2023 CMM2 | $30.00 |
ELECT FINAL RES 01/08/2024 CMM2 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
GAS PRESSURE 02/12/2024 DOT | $30.00 |
ELECT FINAL RES 01/11/2024 DW2 | $30.00 |
FLATWORK RES 02/19/2024 DW2 | $30.00 |
FLATWORK RES 02/22/2024 DW2 | $30.00 |
T-POLE RES 05/17/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $14.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.60 |
T-POLE RES 08/16/2023 JDR | $30.00 |
T-POLE RES 06/07/2023 JR2 | $30.00 |
PTO AND MECH ROUGH 10/03/2023 JR2 | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,338.90 |
RESIDENTIAL FEE | $114.90 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
AUTO PROCESSING FEE | $176.30 |
PLUMBING ROUGH-IN 08/02/2023 SMH | $0.00 |
Total Fees: | $10,317.10 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ T-POLE RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ FLATWORK RES |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|