Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/4/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-03740
JOB ADDRESS:
16628 CHADWELL DR
FRISCO, TX 75035
DESC:   3595 AC, 4552 SF, 2 STORY
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700
DALLAS TX 75234-6099

CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100
Farmers Branch TX 75234
ISSUED DATE:
8/4/2022
APPLIED DATE:
8/4/2022
EXPIRED DATE:
10/17/2023
SITE APN:
ADD269904
STATUS:
COMPLETED
APPLICANT:
Brandi Smith
1800 Valley View Lane
Farmers Branch TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
GAS RELEASE 03/17/2023 DOT$30.00
GAS RELEASE 03/21/2023 DOT$30.00
CO AND BUILD FINAL 04/17/2023 DWF$30.00
CO AND BUILD FINAL 04/20/2023 DWF$30.00
PERCENT CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.60
DRYWALL RES 01/09/2023 GLQ$30.00
BRICKWALL TIES RES 02/16/2023 JR2$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,571.12
RESIDENTIAL FEE$136.56
RESIDENTIAL MECHANICAL FEE$152.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$249.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$2,427.00
WATER IMPACT FEE$2,168.00
AUTO PROCESSING FEE$181.36
INSULATION RES 01/03/2023 RWT$30.00
Total Fees:$10,381.74
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  GAS RELEASE
______  FLATWORK RES
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)