|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/8/2022
|
PERMIT SUB-TYPE: SADD
|
PERMIT NO: B22-03736
|
JOB ADDRESS: 4812 GOLFSIDE DR FRISCO, TX 75035 |
DESC:
1060 SF, ADDITION AND OUTDOOR KITCHEN |
|
OWNER:
GERTAS JOHN L
FRISCO TX 75035-8261
|
CONTRACTOR:
HUNTINGTON REMODEL
5601 Democracy Way, #250 Plano TX 75024
|
ISSUED DATE: 8/8/2022
APPLIED DATE:8/8/2022
EXPIRED DATE:10/1/2023
SITE APN:ADD45934
STATUS:EXPIRED
|
|
APPLICANT:
Mike Thompson
5601 Democracy Dr. #250 Plano TX 75025
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
MISC FRAME RES 10/27/2022 CMM2 | $30.00 |
RESIDENTIAL OUTDOOR AMENITY | $100.00 |
BRICKWALL TIES RES 12/29/2022 DC2 | $30.00 |
RESIDENTIAL FEE | $45.00 |
RESIDENTIAL GENERAL ALTERATIONS | $530.00 |
RESIDENTIAL MECHANICAL FEE | $45.00 |
RESIDENTIAL PLUMBING FEE | $45.00 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
AUTO PROCESSING FEE | $0.40 |
RESIDENTIAL ACCESSORY APPLICATION FEE | $20.00 |
AUTO PROCESSING FEE | $15.30 |
MISC FINAL RES 04/03/2023 RWK | $30.00 |
PLUMBING ROUGH-IN 08/26/2022 SDC | $30.00 |
PLUMBING FINAL 03/30/2023 SME2 | $30.00 |
Total Fees: | $953.70 |
|
|
| ______ PLUMBING ROUGH-IN |
______ MISC SLAB RES |
______ PLUMBING ROUGH-IN |
______ MISC SLAB RES |
______ PLUMBING ROUGH-IN |
______ MISC SLAB RES |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH RES |
______ MISC FRAME RES |
______ MISC FRAME RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MISC FINAL RES |
______ PLUMBING FINAL |
______ ELECT FINAL RES |
______ PLUMBING FINAL |
______ ELECT FINAL RES |
______ PLUMBING FINAL |
______ ELECT FINAL RES |
______ PLUMBING FINAL |
______ MISC FINAL RES |
______ MISC FINAL RES |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|