Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/4/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-03727
JOB ADDRESS:
16316 LYDIAN DR
FRISCO, TX 75035
DESC:   3595 AC, 4552 SF, 2 STORY
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700
DALLAS TX 75234-6099

CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100
Farmers Branch TX 75234
ISSUED DATE:
8/4/2022
APPLIED DATE:
8/4/2022
EXPIRED DATE:
5/14/2024
SITE APN:
ADD269854
STATUS:
COMPLETED
APPLICANT:
Brandi Smith
1800 Valley View Lane
Farmers Branch TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$2.00
UTILITIES INSPECTION 07/27/2023 TL$100.00
SLAB RES 09/29/2022 RWT$30.00
AUTO PROCESSING FEE$181.36
PERCENT CREDIT CARD FEE$0.60
FLATWORK RES 05/19/2023 DWF$30.00
DRYWALL RES 04/11/2023 DWF$30.00
ELECT FINAL RES 07/03/2023 PJF$30.00
WATER IMPACT FEE$2,168.00
THOROUGHFARE IMPACT FEE$2,427.00
SEWER IMPACT FEE$2,344.00
RESIDENTIAL PLUMBING FEE$249.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL MECHANICAL FEE$152.50
RESIDENTIAL FEE$136.56
RESIDENTIAL NEW PERMIT FEE$1,571.12
Z-FIELDS REIMBURSEMENT FEE$0.00
FENCE FEE$20.00
AUTO PROCESSING FEE$6.00
PERCENT CREDIT CARD FEE$12.00
Total Fees:$10,391.94
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  BRICKWALL TIES RES
______  T-POLE RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  FLATWORK RES
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)