|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/18/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03724
|
JOB ADDRESS: 11858 GROVERTON DR FRISCO, TX 75035 |
DESC:
2614 AC, 3347 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 8/18/2022
APPLIED DATE:8/18/2022
EXPIRED DATE:3/20/2024
SITE APN:ADD269832
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 01/19/2023 DWF | $30.00 |
2NDS AND FRAMING 05/15/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $11.20 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
FLATWORK RES 08/07/2023 JDR | $30.00 |
SET 1 PD METER 11/30/2022 JRC | $100.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,177.98 |
RESIDENTIAL FEE | $100.41 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
AUTO PROCESSING FEE | $173.37 |
2NDS AND FRAMING 06/07/2023 PJF | $30.00 |
PTO AND MECH ROUGH 04/25/2023 SDC | $30.00 |
PLUMB MECH FINAL 08/31/2023 SMH | $30.00 |
Total Fees: | $10,555.36 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ T-POLE RES |
______ T-POLE RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ MECHANICAL FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|