|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/11/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03661
|
JOB ADDRESS: 8415 CHALLENGER LN FRISCO, TX 75034 |
DESC:
2148 AC, 3090 SF, 3 STORY |
|
OWNER:
TEXAS LLC MATTAMY
1800 VALLEY VIEW LN STE 460 DALLAS TX 75234-8929
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 8/11/2022
APPLIED DATE:8/11/2022
EXPIRED DATE:9/16/2024
SITE APN:ADD204044
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 02/07/2023 DC2 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
2NDS AND FRAMING 09/11/2023 DP2 | $30.00 |
ELECT FINAL RES 12/08/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $16.80 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $9.10 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $0.60 |
SET 1 PD METER 12/15/2022 HDJ | $100.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $350.00 |
SET 1 PD METER 10/13/2022 JRC | $100.00 |
SET 1 PD METER 10/20/2022 JRC | $100.00 |
SET 1 PD METER 12/19/2022 JRC | $100.00 |
PLUMB MECH FINAL 03/12/2024 JWR | $30.00 |
PLUMBING ROUGH-IN 12/07/2022 MLM | $30.00 |
GAS RELEASE 12/15/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,090.60 |
RESIDENTIAL FEE | $92.70 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $243.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $123.71 |
SHEATHING RES 06/07/2023 RWK | $30.00 |
DRYWALL RES 10/10/2023 RWT | $30.00 |
DRYWALL RES 10/12/2023 RWT | $30.00 |
DRYWALL RES 10/16/2023 RWT | $30.00 |
UTILITIES INSPECTION 03/08/2024 TL | $100.00 |
REPLACE READABLE REGISTER | $355.00 |
Total Fees: | $8,772.31 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ INSULATION RES |
______ PTO AND MECH ROUGH |
______ INSULATION RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|