|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/17/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03633
|
JOB ADDRESS: 4228 WILLOW POND DR FRISCO, TX 75034 |
DESC:
2288 AC, 2816 SF, 3 STORY |
|
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 8/17/2022
APPLIED DATE:8/16/2022
EXPIRED DATE:5/15/2024
SITE APN:ADD204101
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
PLAN REVIEW FEE | $50.00 |
2NDS AND FRAMING 08/09/2023 DP2 | $30.00 |
2NDS AND FRAMING 08/14/2023 DP2 | $30.00 |
2NDS AND FRAMING 08/18/2023 DP2 | $30.00 |
SLAB RES 11/02/2022 DW2 | $30.00 |
SHEATHING RES 05/22/2023 DW2 | $30.00 |
FIRE RATED WALL RES 05/25/2023 DW2 | $30.00 |
SHEATHING RES 05/31/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $8.60 |
PERCENT CREDIT CARD FEE | $12.60 |
FIRE RATED WALL RES 02/13/2023 GLQ | $30.00 |
REPLACE READABLE REGISTER | $310.00 |
PTO AND MECH ROUGH 06/22/2023 MLM | $30.00 |
PTO AND MECH ROUGH 06/29/2023 MLM | $30.00 |
PTO AND MECH ROUGH 07/10/2023 MLM | $30.00 |
GAS RELEASE 10/12/2023 MRT | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $995.60 |
RESIDENTIAL FEE | $84.48 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $228.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $121.34 |
SHEATHING RES 06/06/2023 RWK | $30.00 |
PLUMBING ROUGH-IN 10/18/2022 SDC | $30.00 |
PLUMB MECH FINAL 11/14/2023 SDC | $30.00 |
PTO AND MECH ROUGH 05/01/2023 SME2 | $30.00 |
UTILITIES INSPECTION 11/10/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $8,534.42 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ SLAB RES |
______ SLAB RES |
______ T-POLE RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ GAS PRESSURE |
______ WATER REGISTER |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|