|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/12/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03538
|
JOB ADDRESS: 4157 PYRAMID LN FRISCO, TX 75034 |
DESC:
2148 AC, 3090 SF,3 STORY |
|
OWNER:
FRISCO 32 LLC CADG
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1801 Wittinton Place, Suite 100 Farmers Branch TX 75234
|
ISSUED DATE: 8/12/2022
APPLIED DATE:8/12/2022
EXPIRED DATE:9/3/2024
SITE APN:ADD204072
STATUS:COMPLETED
|
|
APPLICANT:
Brandi Smith
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
PLAN REVIEW FEE | $50.00 |
REPLACEMENT CARD FEE | $10.00 |
FIRE RATED WALL RES 08/10/2023 DP2 | $30.00 |
FIRE RATED WALL RES 08/25/2023 DP2 | $30.00 |
FIRE RATED WALL RES 06/14/2023 DW2 | $30.00 |
FIRE RATED WALL RES 06/19/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $12.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $1.80 |
ELECT FINAL RES 01/09/2024 GLQ | $30.00 |
ELECT FINAL RES 01/11/2024 GLQ | $30.00 |
SLAB RES 12/15/2022 JDR | $30.00 |
GAS PRESSURE 01/17/2024 JR2 | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,090.60 |
RESIDENTIAL FEE | $92.70 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $243.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $123.71 |
T-POLE RES 08/30/2022 REED | $30.00 |
2NDS AND FRAMING 11/09/2023 RWT | $30.00 |
BRICKWALL TIES RES 11/15/2023 RWT | $30.00 |
INSULATION RES 11/15/2023 RWT | $30.00 |
2NDS AND FRAMING 11/15/2023 RWT | $30.00 |
Total Fees: | $7,635.01 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ SLAB RES |
______ SLAB RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ GAS PRESSURE |
______ ELECT FINAL RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ ELECT FINAL RES |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS PRESSURE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|