|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/3/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03510
|
JOB ADDRESS: 15567 FRINGE TREE RD FRISCO, TX 75035 |
DESC:
2435 AC, 3017 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
733 8TH AVE SAN DIEGO CA 92101-6407
|
CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD LEWISVILLE TX 75056
|
ISSUED DATE: 8/3/2022
APPLIED DATE:7/22/2022
EXPIRED DATE:3/13/2024
SITE APN:ADD280702
STATUS:COMPLETED
|
|
APPLICANT:
Liliana Moton
4400 State Highway 121 Lewisville TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 08/09/2023 SDC | $30.00 |
PLUMBING ROUGH-IN 02/24/2023 JWE2 | $30.00 |
2NDS AND FRAMING 05/12/2023 RWK | $30.00 |
PTO AND MECH ROUGH 05/04/2023 SDC | $30.00 |
PLUMBING ROUGH-IN 02/21/2023 SME2 | $30.00 |
PLUMBING ROUGH-IN 02/17/2023 SME2 | $30.00 |
DRYWALL RES 06/01/2023 RWK | $30.00 |
2NDS AND FRAMING 05/11/2023 RWK | $30.00 |
WATER IMPACT FEE | $2,120.00 |
THOROUGHFARE IMPACT FEE | $1,273.00 |
SEWER IMPACT FEE | $0.00 |
RESIDENTIAL PLUMBING FEE | $249.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $119.50 |
RESIDENTIAL FEE | $90.51 |
RESIDENTIAL NEW PERMIT FEE | $1,065.78 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
WATER METER DEPOSIT | $150.00 |
1 INCH PD METER | $450.00 |
PTO AND MECH ROUGH 05/01/2023 MLM | $30.00 |
PERCENT CREDIT CARD FEE | $2.40 |
Total Fees: | $6,119.19 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|