Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/27/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-03359
JOB ADDRESS:
4989 POINT GIVEN ST
FRISCO, TX 75034
DESC:   3977 AC, 4889 SF, 2 STORY
OWNER:
SILVERLEAF TOWER LP
15400 KNOLL TRAIL DR STE 230
DALLAS TX 75248

CONTRACTOR:
GRAND TEXAS HOMES GP, LLC
15455 Dallas Parkway Ste. 1000
Addison TX 75001
ISSUED DATE:
7/27/2022
APPLIED DATE:
7/21/2022
EXPIRED DATE:
5/12/2023
SITE APN:
ADD239216
STATUS:
COMPLETED
APPLICANT:
Linda Sanville
15455 Dallas Parkway # 1000
Addison TX 75001
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
DRYWALL RES 12/21/2022 CMM2$30.00
FLATWORK RES 01/09/2023 CMM2$30.00
ELECT FINAL RES 03/14/2023 CMM2$30.00
PLAN REVIEW FEE$50.00
PERCENT CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$2.00
SLAB RES 08/10/2022 GLQ$30.00
SLAB RES 08/12/2022 GLQ$30.00
2NDS AND FRAMING 10/31/2022 JDR$30.00
2NDS AND FRAMING 11/03/2022 JDR$30.00
2NDS AND FRAMING 11/04/2022 JDR$30.00
INSULATION RES 11/16/2022 JDR$30.00
FLATWORK RES 12/29/2022 JDR$30.00
DRYWALL RES 01/04/2023 JDR$30.00
LATH RES 01/03/2023 JWE2$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
Z-FIELDS REIMBURSEMENT FEE$0.00
RESIDENTIAL NEW PERMIT FEE$1,675.59
RESIDENTIAL FEE$146.67
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$264.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$2,424.00
WATER IMPACT FEE$2,203.00
AUTO PROCESSING FEE$185.47
T-POLE RES 07/28/2022 RWT$30.00
PTO AND MECH ROUGH 10/17/2022 SME2$30.00
UTILITIES INSPECTION 04/24/2023 TL$100.00
Total Fees:$10,907.13
______  T-POLE RES
______  METER PAYMENT
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  BRICKWALL TIES RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  DRYWALL RES
______  LATH RES
______  DRYWALL RES
______  FLATWORK RES
______  LATH RES
______  INSULATION RES
______  FLATWORK RES
______  DRYWALL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  ELECT FINAL RES
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)