|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/22/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03201
|
JOB ADDRESS: 6939 PADDINGTON LN FRISCO, TX 75034 |
DESC:
4783 AC , 5818 SF, 2 STORY |
|
OWNER:
HT STONEBROOK LAND I LP
2200 ROSS AVE STE 4200W DALLAS TX 75201
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460 PLANO TX 75093
|
ISSUED DATE: 8/22/2022
APPLIED DATE:8/2/2022
EXPIRED DATE:11/13/2023
SITE APN:ADD221497
STATUS:COMPLETED
|
|
APPLICANT:
Erin Storm
2400 Dallas Parkway Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
INSULATION RES 01/30/2023 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.60 |
INSULATION RES 02/03/2023 JDR | $30.00 |
INSULATION RES 02/06/2023 JDR | $30.00 |
INSULATION RES 01/26/2023 JR2 | $30.00 |
AUTO PROCESSING FEE | $2.25 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,952.22 |
RESIDENTIAL FEE | $174.54 |
RESIDENTIAL MECHANICAL FEE | $185.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $307.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $119.00 |
WATER IMPACT FEE | $2,151.00 |
PTO AND MECH ROUGH 01/10/2023 SMH | $30.00 |
Total Fees: | $8,358.51 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ PTO AND MECH ROUGH |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ LATH RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|