|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/3/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-03017
|
JOB ADDRESS: 14681 FARMING RD FRISCO, TX 75035 |
DESC:
4320 AC, 5241 SF, 2 STORY |
|
OWNER:
TEXAS HOMES INC FIRST
500 CRESCENT CT STE 350 DALLAS TX 75201-7854
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
500 CRESCENT CT STE 350 DALLAS TX 75201
|
ISSUED DATE: 8/3/2022
APPLIED DATE:6/28/2022
EXPIRED DATE:2/25/2024
SITE APN:ADD279758
STATUS:COMPLETED
|
|
APPLICANT:
Ana Gutierrez
500 Crescent Court, Suite 350 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRYWALL RES 05/22/2023 CMM2 | $30.00 |
PERCENT CREDIT CARD FEE | $8.20 |
PTO AND MECH ROUGH 03/09/2023 DOT | $30.00 |
2NDS AND FRAMING 04/28/2023 DWF | $30.00 |
BRICKWALL TIES RES 06/02/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
BRICKWALL TIES RES 06/06/2023 JDR | $30.00 |
BRICKWALL TIES RES 06/07/2023 JDR | $30.00 |
FLATWORK RES 07/07/2023 JDR | $30.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
RESIDENTIAL NEW PERMIT FEE | $1,782.30 |
RESIDENTIAL FEE | $157.23 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $257.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $826.00 |
WATER IMPACT FEE | $2,208.00 |
RESIDENTIAL NEW PERMIT FEE | $1,782.30 |
RESIDENTIAL FEE | $157.23 |
FENCE FEE | $20.00 |
PLUMBING ROUGH-IN 11/03/2022 SME2 | $30.00 |
PLUMBING ROUGH-IN 12/01/2022 SME2 | $30.00 |
UTILITIES INSPECTION 08/15/2023 TL | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $11,293.66 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|