Seal BUILDING
Permit Payment Receipt


CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/5/2023 PERMIT SUB-TYPE: MNEW PERMIT NO: B22-02819
JOB ADDRESS:
4220 TRIBUTARY WAY
FRISCO, TX 75034
DESC:   547389 SF, LMC FRISCO
OWNER:
LMC SPRING CREEK HOLDINGS LLC

DALLAS TX 75201

CONTRACTOR:
Quarterra Construction, LLC
500 N Akard Street
Dallas TX 75201
ISSUED DATE:
5/5/2023
APPLIED DATE:
5/31/2022
EXPIRED DATE:
4/5/2026
SITE APN:
ADD307960
STATUS:
COMPLETED
APPLICANT:
Matt Frame
2808 Fairmount St.
Dallas TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
70880551
FEE SUMMARY
INSPECTION SUMMARY
SLAB COMM 09/21/2023 DC2$35.00
SLAB COMM 10/17/2023 DC2$35.00
SLAB COMM 02/15/2024 DC2$35.00
SHEATHING COMM 03/11/2024 DC2$35.00
FRAME COMM 05/13/2024 DC2$35.00
ELECT ROUGH COMM 07/26/2024 DC2$35.00
ELECT ROUGH COMM 08/06/2024 DC2$35.00
DRYWALL COMM 08/27/2024 DC2$35.00
DRYWALL COMM 09/13/2024 DC2$35.00
FRAME COMM 09/16/2024 DC2$35.00
INSULATION COMM 09/17/2024 DC2$35.00
FRAME COMM 09/18/2024 DC2$35.00
FRAME COMM 09/19/2024 DC2$35.00
INSULATION COMM 09/24/2024 DC2$35.00
DRYWALL COMM 09/24/2024 DC2$35.00
DRYWALL COMM 11/05/2024 DC2$35.00
DRYWALL COMM 11/18/2024 DC2$35.00
ELECT FINAL COMM 03/12/2025 DC2$35.00
ELECT FINAL COMM 04/30/2025 DC2$35.00
ELECT FINAL COMM 05/02/2025 DC2$35.00
PERCENT CREDIT CARD FEE$2.70
PERCENT CREDIT CARD FEE$3.40
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$2.80
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$3.80
PERCENT CREDIT CARD FEE$3.88
PERCENT CREDIT CARD FEE$3.50
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$0.70
COMM BUILDING PERMIT FEE$100.00
COMM BUILDING PERMIT FEE$50.00
MECHANICAL FINAL 07/01/2025 JWR$35.00
PLUMB TOP OUT COMM 08/09/2024 MLM$35.00
MECHANICAL ROUGH 08/21/2024 MLM$35.00
AUTO PROCESSING FEE$6.00
COMMERCIAL FEE$21,925.56
COMMERCIAL BUILDING PERMIT FEE$135,140.34
COMMERCIAL MECHANICAL FEE$27,399.45
COMMERCIAL NEW APPLICATION FEE$300.00
COMMERCIAL PLUMBING FEE$49,295.01
SEWER IMPACT FEE$90,396.00
THOROUGHFARE IMPACT FEE$435,230.00
WATER IMPACT FEE$91,446.00
PLAN REVIEW FEE$100.00
FOOTINGS COMM 10/02/2023 REED$35.00
PLUMBING ROUGH-IN 12/14/2023 SDC$35.00
PLUMBING ROUGH-IN 01/03/2024 SDC$35.00
MECHANICAL FINAL 12/16/2024 SDC$35.00
PLUMB TOP OUT COMM 06/10/2024 SME2$35.00
PLUMB TOP OUT COMM 06/14/2024 SME2$35.00
PLUMB TOP OUT COMM 06/28/2024 SME2$35.00
PLUMB TOP OUT COMM 07/11/2024 SME2$35.00
MECHANICAL ROUGH 07/12/2024 SME2$35.00
PLUMBING FINAL 05/06/2025 SMH$35.00
6 INCH COMP METER$8,290.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
Total Fees:$861,965.34
______  MEETING
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PIER COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FIRELANE INSPECTION
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  MEETING
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  T-POLE COMM
______  SLAB COMM
______  FOOTINGS COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  SLAB COMM
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  T-POLE COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  FOOTINGS COMM
______  T-POLE COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  SLAB COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  CMUWALL
______  FOOTINGS COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  UNDERGROUND ELEC
______  FOOTINGS COMM
______  SLAB COMM
______  UNDERGROUND ELEC
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  SLAB COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  FOOTINGS COMM
______  SLAB COMM
______  PAVING
______  PAVING
______  PLUMBING ROUGH-IN
______  PAVING
______  PAVING
______  PAVING
______  SHEATHING COMM
______  SLAB COMM
______  SHEATHING COMM
______  SHEATHING COMM
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  SHEATHING COMM
______  FRAME COMM
______  SLAB COMM
______  SLAB COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  SHEATHING COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  SLAB COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  GAS PRESSURE
______  PLUMB TOP OUT COMM
______  GAS PRESSURE
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  SHEATHING COMM
______  BRICKWALL TIE COMM
______  GAS PRESSURE
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  SHEATHING COMM
______  CEILING
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  INSULATION COMM
______  SHEATHING COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  CONSTRUCTION SAFETY
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  CONSTRUCTION SAFETY
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  FIREINSULATION
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  FRAME COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  FRAME COMM
______  INSULATION COMM
______  LATH COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  PIER COMM
______  ELECT RELEASE COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  INSULATION COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  FRAME COMM
______  INSULATION COMM
______  DRYWALL COMM
______  FIREINSULATION
______  FRAME COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  INSULATION COMM
______  FIREINSULATION
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  FRAME COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  FRAME COMM
______  INSULATION COMM
______  INSULATION COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FIREINSULATION
______  INSULATION COMM
______  FRAME COMM
______  FIREINSULATION
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  INSULATION COMM
______  LATH COMM
______  FRAME COMM
______  FRAME COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  DRYWALL COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  INSULATION COMM
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  DRYWALL COMM
______  FRAME COMM
______  INSULATION COMM
______  FIREINSULATION
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  BRICKWALL TIE COMM
______  ELECT RELEASE COMM
______  FIREINSULATION
______  FRAME COMM
______  INSULATION COMM
______  UNDERGROUND ELEC
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  ELECT RELEASE COMM
______  FRAME COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  FIREINSULATION
______  FRAME COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  UNDERGROUND ELEC
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  INSULATION COMM
______  DRYWALL COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELECT RELEASE COMM
______  UNDERGROUND ELEC
______  MECHANICAL FINAL
______  FLATWORK COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  FLATWORK COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  METER PAYMENT
______  PLUMBING FINAL
______  SET 6IN CMPND METER
______  FLATWORK COMM
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL ROUGH
______  ELECT FINAL COMM
______  FLATWORK COMM
______  FLATWORK COMM
______  ELECT FINAL COMM
______  FLATWORK COMM
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  FLATWORK COMM
______  GAS RELEASE
______  PLUMBING FINAL
______  FLATWORK COMM
______  STOCK AND FURNISH
______  BUILDING FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  LIFESAFETY
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELEVATOR
______  BUILDING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  COMM CO
______  ELEVATOR
______  FIRE FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMB MECH FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  ELEVATOR
______  FIRE FINAL
______  COMM CO
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  LIFESAFETY
______  FIRE FINAL
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELEVATOR
______  FIRE FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELEVATOR
______  FIRE FINAL
______  BUILDING FINAL
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  LIFESAFETY
______  COMM CO
______  BUILDING FINAL
______  COMM CO
______  FIRE FINAL
______  INSPECTION ASSIST
______  FIRE LIFE SAFETY
______  INSPECTION ASSIST
______  COMM CO
Notes: