|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/10/2022
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B22-02739
|
JOB ADDRESS: 8990 COIT RD FRISCO, TX 75035 |
DESC:
9200 SF, SHELL BUILDING |
|
OWNER:
COIT N MAIN LLC
FRISCO TX 75035-0532
|
CONTRACTOR:
MJR ENGINEERING (GC)
3030 LBJ FWY SUITE 1150 DALLAS TX 75234
|
ISSUED DATE: 8/10/2022
APPLIED DATE:5/24/2022
EXPIRED DATE:12/8/2024
SITE APN:ADD266217
STATUS:ISSUED
|
|
APPLICANT:
Moahammed Kamal
3030 LBJ Freeway STE 1150 Dallas TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 930892
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BRICKWALL TIE COMM 01/12/2024 DC2 | $35.00 |
BRICKWALL TIE COMM 03/22/2024 DC2 | $35.00 |
ELECT FINAL COMM 03/26/2024 DC2 | $35.00 |
PERCENT CREDIT CARD FEE | $42.00 |
PERCENT CREDIT CARD FEE | $4.80 |
PERCENT CREDIT CARD FEE | $1.00 |
FIRE FINAL 04/12/2024 JLW | $50.00 |
SET 2 T-10 METER 10/24/2023 JRC | $100.00 |
2 INCH T-10 METER | $1,000.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
AUTO PROCESSING FEE | $6.00 |
COMMERCIAL FEE | $398.00 |
COMMERCIAL BUILDING PERMIT FEE | $2,868.60 |
COMMERCIAL MECHANICAL FEE | $43.50 |
COMMERCIAL NEW APPLICATION FEE | $300.00 |
COMMERCIAL PLUMBING FEE | $858.00 |
SEWER IMPACT FEE | $10,714.00 |
THOROUGHFARE IMPACT FEE | $13,860.00 |
WATER IMPACT FEE | $12,718.00 |
PLUMB TOP OUT COMM 03/22/2024 SME2 | $35.00 |
Total Fees: | $44,203.90 |
|
|
| ______ PLUMBING ROUGH-IN |
______ SLAB COMM |
______ PAVING |
______ ELECT ROUGH COMM |
______ FIRELANE INSPECTION |
______ METER PAYMENT |
______ SET 2 T-10 METER |
______ SET 2 T-10 METER |
______ LATH COMM |
______ BRICKWALL TIE COMM |
______ BRICKWALL TIE COMM |
______ ELECT RELEASE COMM |
______ PLUMB TOP OUT COMM |
______ FRAME AND ELEC WALL |
______ PLUMB TOP OUT COMM |
______ FRAME AND ELEC WALL |
______ CEILING |
______ BRICKWALL TIE COMM |
______ PLUMB TOP OUT COMM |
______ BRICKWALL TIE COMM |
______ ELECT FINAL COMM |
______ PLUMBING FINAL |
______ ELECT FINAL COMM |
______ BUILDING FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ BUILDING FINAL |
______ BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|