|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/2/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-01894
|
JOB ADDRESS: 12374 HARVEST MEADOW DR FRISCO, TX 75033 |
DESC:
7750 AC, 10424 SF, 2 STORY |
|
OWNER:
LLC RDCH LAND COMPANY
17850 DAVENPORT RD STE 109 DALLAS TX 75252
|
CONTRACTOR:
PREMIER RENOVATIONS INC dba RON DAVIS CUSTOM HOMES
17818 DAVENPORT RD STE 116 DALLAS TX 75252
|
ISSUED DATE: 8/2/2022
APPLIED DATE:7/12/2022
EXPIRED DATE:1/5/2025
SITE APN:ADD191831
STATUS:COMPLETED
|
|
APPLICANT:
Ron Davis
17818 Davenport Rd Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 04/30/2024 CI | $30.00 |
2NDS AND FRAMING 06/12/2023 CMM2 | $30.00 |
INSULATION RES 06/28/2023 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $0.00 |
PLAN REVIEW FEE | $50.00 |
Z-FIELDS REIMBURSEMENT FEE | $0.00 |
DRYWALL RES 12/21/2023 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.20 |
PERCENT CREDIT CARD FEE | $9.10 |
PERCENT CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 05/03/2023 JDR | $30.00 |
2NDS AND FRAMING 05/24/2023 JDR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $3,180.24 |
RESIDENTIAL FEE | $312.72 |
RESIDENTIAL MECHANICAL FEE | $251.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $389.00 |
SEWER IMPACT FEE | $2,294.00 |
THOROUGHFARE IMPACT FEE | $5,322.00 |
WATER IMPACT FEE | $3,085.00 |
AUTO PROCESSING FEE | $298.08 |
AUTO PROCESSING FEE | $12.00 |
SLAB RES 09/06/2022 PJF | $30.00 |
SLAB RES 09/07/2022 PJF | $30.00 |
FLATWORK RES 03/22/2024 RWT | $30.00 |
FLATWORK RES 04/24/2024 RWT | $30.00 |
GAS RELEASE 03/07/2024 SDC | $30.00 |
PLUMB MECH FINAL 06/19/2024 SMH | $30.00 |
UTILITIES INSPECTION 06/13/2024 TL | $100.00 |
REPLACE READABLE REGISTER | $355.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $17,002.34 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ LATH RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT RELEASE RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|