Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/4/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01842
JOB ADDRESS:
12411 HARVEST MEADOW DR
FRISCO, TX 75033
DESC:   7353 AC, 10678 SF, 2 STORY
OWNER:
NEWMAN VILLAGE CONSTRUCTION LLC
9801 CAMFIELD WAY
FRISCO TX 75033

CONTRACTOR:
COATS HOMES LLC
3100 MONTICELLO AVE STE 335
DALLAS TX 75205
ISSUED DATE:
5/4/2022
APPLIED DATE:
5/3/2022
EXPIRED DATE:
3/24/2025
SITE APN:
ADD191841
STATUS:
ISSUED
APPLICANT:
Paul Harrison
3100 Monticello Ave. STE 335
Dallas TX 75205
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
PLAN REVIEW FEE$50.00
2NDS AND FRAMING 10/17/2023 DW2$30.00
2NDS AND FRAMING 10/31/2023 DW2$30.00
2NDS AND FRAMING 11/13/2023 DW2$30.00
CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
SHEATHING RES 01/18/2023 GLQ$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$3,246.28
RESIDENTIAL FEE$320.34
RESIDENTIAL MECHANICAL FEE$244.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$417.00
SEWER IMPACT FEE$2,294.00
THOROUGHFARE IMPACT FEE$5,322.00
WATER IMPACT FEE$2,294.00
AUTO PROCESSING FEE$284.16
2NDS AND FRAMING 10/30/2023 RWK$30.00
DRYWALL RES 01/03/2024 RWK$30.00
T-POLE RES 06/02/2022 RWT$30.00
BRICKWALL TIES RES 03/05/2024 RWT$30.00
PTO AND MECH ROUGH 10/02/2023 SDC$30.00
Total Fees:$15,685.08
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  T-POLE RES
______  PIER RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SHEATHING RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  PTO AND MECH ROUGH
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)