Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/21/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01734
JOB ADDRESS:
11813 TAVENDALE DR
FRISCO, 75035
DESC:   3908 AC, 4729 SF, 2 STORY
OWNER:
BEAZER HOMES
1501 LBJ FREEWAY #300
FARMERS BRANCH TX 75234

CONTRACTOR:
BEAZER HOMES
1501 LBJ FREEWAY #300
FARMERS BRANCH TX 75234
ISSUED DATE:
4/21/2022
APPLIED DATE:
4/19/2022
EXPIRED DATE:
11/11/2023
SITE APN:
ADD269868
STATUS:
COMPLETED
APPLICANT:
Jamie Allen
1501 LBJ Freeway Suite 300
Dallas TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
CO AND BUILD FINAL 04/26/2023 CMM2$30.00
SLAB RES 08/09/2022 DC2$30.00
SLAB RES 08/15/2022 DW2$30.00
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$6.20
PERCENT CREDIT CARD FEE$0.60
REPLACE READABLE REGISTER$310.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,625.99
RESIDENTIAL FEE$141.87
RESIDENTIAL MECHANICAL FEE$152.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$278.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$2,427.00
WATER IMPACT FEE$2,168.00
2NDS AND FRAMING 10/26/2022 RWK$30.00
2NDS AND FRAMING 11/08/2022 RWK$30.00
2NDS AND FRAMING 11/10/2022 RWK$30.00
INSULATION RES 11/23/2022 RWK$30.00
INSULATION RES 11/28/2022 RWK$30.00
INSULATION RES 11/30/2022 RWK$30.00
PTO AND MECH ROUGH 10/13/2022 SMH$30.00
UTILITIES INSPECTION 04/05/2023 TL$100.00
REPLACE READABLE REGISTER$310.00
Total Fees:$11,091.36
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  SLAB RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  WATER REGISTER
______  BRICKWALL TIES RES
______  ELECT FINAL RES
______  FLATWORK RES
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)