APPROVED DATE: 9/28/2022
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B22-01571
|
JOB ADDRESS: 13800 NICOLLET DR FRISCO, TX 75033 |
DESC:
15200 SF, FIELDS BROOKSIDE DEVELOPMENT |
|
OWNER:
FHQ HOLDINGS LP
DALLAS TX 75201
|
CONTRACTOR:
PRESTON PIERCE CONSTRUCTION (GC)
6333 E MOCKINGBIRD LN 147-505 DALLAS TX 75214
|
ISSUED DATE: 9/28/2022
APPLIED DATE:3/30/2022
EXPIRED DATE:12/11/2024
SITE APN:ADD305550
STATUS:COMPLETED
|
|
APPLICANT:
Jeremy Gorden
5005 Greenville Ave Dallas TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 13500000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $42.00 |
PERCENT CREDIT CARD FEE | $42.84 |
PERCENT CREDIT CARD FEE | $43.70 |
PERCENT CREDIT CARD FEE | $0.70 |
PERCENT CREDIT CARD FEE | $0.70 |
2 INCH T-10 METER | $1,000.00 |
WATER METER DEPOSIT COMMERCIAL | $1,100.00 |
GAS RELEASE 01/05/2024 MLM | $35.00 |
AUTO PROCESSING FEE | $6.00 |
COMMERCIAL FEE | $775.48 |
COMMERCIAL BUILDING PERMIT FEE | $26,692.14 |
COMMERCIAL MECHANICAL FEE | $961.85 |
COMMERCIAL NEW APPLICATION FEE | $300.00 |
COMMERCIAL PLUMBING FEE | $1,707.33 |
SEWER IMPACT FEE | $10,714.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $19,380.00 |
PLUMBING ROUGH-IN 04/13/2023 SDC | $30.00 |
PLUMB TOP OUT COMM 09/08/2023 SMH | $35.00 |
Total Fees: | $62,867.34 |
|
|
| ______ FOOTINGS COMM |
______ FOOTINGS COMM |
______ FOOTINGS COMM |
______ T-POLE COMM |
______ ELECT ROUGH COMM |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ SLAB COMM |
______ PLUMBING ROUGH-IN |
______ FOOTINGS COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ METER PAYMENT |
______ ELECT ROUGH COMM |
______ SET 2 T-10 METER |
______ FOOTINGS COMM |
______ PAVING |
______ SET 2 T-10 METER |
______ PAVING |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MECHANICAL ROUGH |
______ PLUMBING ROUGH-IN |
______ BRICKWALL TIE COMM |
______ MECHANICAL ROUGH |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECT ROUGH COMM |
______ BRICKWALL TIE COMM |
______ SHEATHING COMM |
______ GAS PRESSURE |
______ PLUMB TOP OUT COMM |
______ PLUMB TOP OUT COMM |
______ MECHANICAL ROUGH |
______ ELECT ROUGH COMM |
______ FLATWORK COMM |
______ PLUMB TOP OUT COMM |
______ FRAME COMM |
______ ELECT ROUGH COMM |
______ PLUMB TOP OUT COMM |
______ CEILING |
______ FRAME COMM |
______ FRAME COMM |
______ FLATWORK COMM |
______ FRAME COMM |
______ PLUMBING ROUGH-IN |
______ FOOTINGS COMM |
______ MECHANICAL ROUGH |
______ SLAB COMM |
______ ELECT RELEASE COMM |
______ FRAME COMM |
______ PLUMBING ROUGH-IN |
______ INSULATION COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ FLATWORK COMM |
______ FLATWORK COMM |
______ ELECT ROUGH COMM |
______ FLATWORK COMM |
______ CEILING |
______ ELECT ROUGH COMM |
______ DRYWALL COMM |
______ DRYWALL COMM |
______ FOOTINGS COMM |
______ PLUMB TOP OUT COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ ELECT ROUGH COMM |
______ GAS RELEASE |
______ FLATWORK COMM |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ MECHANICAL FINAL |
______ ELECT FINAL COMM |
______ FIRE FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ COMM CO |
______ COMM CO |
______ COMM CO |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|