|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/16/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-01470
|
JOB ADDRESS: 8263 CHALLENGER LN FRISCO, 75034 |
DESC:
2289 AC, 2817 SF, 3 STORY |
|
OWNER:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 6/16/2022
APPLIED DATE:6/13/2022
EXPIRED DATE:12/22/2024
SITE APN:ADD204025
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Marco
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
T-POLE RES 07/28/2022 CAB | $30.00 |
PLAN REVIEW FEE | $100.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $8.30 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.60 |
PERCENT CREDIT CARD FEE | $0.00 |
2NDS AND FRAMING 02/01/2024 GLQ | $30.00 |
BRICKWALL TIES RES 02/28/2024 GLQ | $30.00 |
REPLACE READABLE REGISTER | $355.00 |
2NDS AND FRAMING 01/03/2024 JDR | $30.00 |
FLATWORK RES 05/03/2024 JDR | $30.00 |
PLUMB MECH FINAL 06/07/2024 JR2 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $995.95 |
RESIDENTIAL FEE | $84.51 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $242.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,186.00 |
AUTO PROCESSING FEE | $122.63 |
2NDS AND FRAMING 11/21/2023 RWT | $30.00 |
PTO AND MECH ROUGH 11/01/2023 SDC | $30.00 |
GAS RELEASE 04/25/2024 SME2 | $30.00 |
GAS RELEASE 03/04/2024 SMH | $30.00 |
UTILITIES INSPECTION 05/28/2024 TL | $100.00 |
UTILITIES INSPECTION 05/31/2024 TL | $100.00 |
Total Fees: | $8,054.39 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ SHEATHING RES |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ WATER REGISTER |
______ FLATWORK RES |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|