Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/16/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01465
JOB ADDRESS:
8287 CHALLENGER LN
FRISCO, 75034
DESC:   2150 AC, 3092 SF, 3 STORY
OWNER:
MATTAMY TEXAS, LLC
1800 Valley View Lane
Farmers Branch TX 75234

CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane
Farmers Branch TX 75234
ISSUED DATE:
6/16/2022
APPLIED DATE:
6/14/2022
EXPIRED DATE:
12/18/2024
SITE APN:
ADD204028
STATUS:
COMPLETED
APPLICANT:
Melissa Marco
1800 Valley View Lane
Farmers Branch TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
T-POLE RES 07/28/2022 CAB$30.00
PLAN REVIEW FEE$100.00
FIRE RATED WALL RES 07/26/2023 DP2$30.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$11.20
PERCENT CREDIT CARD FEE$0.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.01
2NDS AND FRAMING 12/22/2023 GLQ$30.00
BRICKWALL TIES RES 02/28/2024 GLQ$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
2NDS AND FRAMING 12/14/2023 JDR$30.00
ELECT FINAL RES 05/02/2024 JDR$30.00
PLUMB MECH FINAL 06/07/2024 JR2$30.00
REPLACEMENT CARD FEE$10.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,091.28
RESIDENTIAL FEE$92.76
RESIDENTIAL MECHANICAL FEE$159.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$243.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,186.00
AUTO PROCESSING FEE$124.72
PTO AND MECH ROUGH 11/14/2023 SDC$30.00
GAS RELEASE 04/25/2024 SME2$30.00
GAS RELEASE 03/04/2024 SMH$30.00
Total Fees:$8,105.57
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  SHEATHING RES
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  GAS RELEASE
______  GAS RELEASE
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  FLATWORK RES
______  ELECT FINAL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)