|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/7/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-01329
|
JOB ADDRESS: 11540 DAWN MIST DR FRISCO, TX 75035 |
DESC:
3372 AC, 4121 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane Farmers Branch TX 75234
|
ISSUED DATE: 6/7/2022
APPLIED DATE:6/7/2022
EXPIRED DATE:12/25/2023
SITE APN:ADD269919
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Marco
1800 Valley View Lane Farmers Branch TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 06/08/2023 CI | $30.00 |
PLAN REVIEW FEE | $50.00 |
FLATWORK RES 04/19/2023 DWF | $30.00 |
FLATWORK RES 04/21/2023 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $11.40 |
PERCENT CREDIT CARD FEE | $2.00 |
FLATWORK RES 04/25/2023 JWE2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
UTILITIES INSPECTION 06/09/2023 NMN | $100.00 |
REPLACE READABLE REGISTER | $310.00 |
2NDS AND FRAMING 01/30/2023 PJF | $30.00 |
GAS RELEASE 05/10/2023 SDC | $30.00 |
PTO AND MECH ROUGH 11/28/2022 SME2 | $30.00 |
UTILITIES INSPECTION 06/08/2023 TL | $100.00 |
UTILITIES INSPECTION 06/14/2023 TL | $100.00 |
AUTO PROCESSING FEE | $180.07 |
WATER IMPACT FEE | $2,168.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
SEWER IMPACT FEE | $2,344.00 |
RESIDENTIAL PLUMBING FEE | $278.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL FEE | $123.63 |
RESIDENTIAL NEW PERMIT FEE | $1,433.72 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
Total Fees: | $10,937.82 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|