Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/9/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01323
JOB ADDRESS:
16840 MAPLE BEND DR
FRISCO, TX 75035
DESC:   3494 AC, 4243 SF, 2 STORY
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700
DALLAS TX 75234-6099

CONTRACTOR:
MATTAMY TEXAS, LLC
1800 Valley View Lane
Farmers Branch TX 75234
ISSUED DATE:
5/9/2022
APPLIED DATE:
5/9/2022
EXPIRED DATE:
3/19/2024
SITE APN:
ADD269987
STATUS:
COMPLETED
APPLICANT:
Melissa Marco
1800 Valley View Lane
Farmers Branch TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
DRYWALL RES 04/26/2023 CMM2$30.00
INSULATION RES 04/21/2023 DC2$30.00
2NDS AND FRAMING 04/18/2023 DP2$30.00
SLAB RES 08/30/2022 DW2$30.00
2NDS AND FRAMING 04/11/2023 DWF$30.00
2NDS AND FRAMING 04/13/2023 DWF$30.00
FLATWORK RES 05/08/2023 DWF$30.00
FLATWORK RES 05/16/2023 DWF$30.00
FLATWORK RES 05/19/2023 DWF$30.00
FLATWORK RES 05/26/2023 DWF$30.00
FLATWORK RES 05/30/2023 DWF$30.00
PERCENT CREDIT CARD FEE$12.00
PERCENT CREDIT CARD FEE$2.00
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$3.00
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$3.80
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
CO AND BUILD FINAL 09/19/2023 JDR$30.00
SLAB RES 09/01/2022 JR2$30.00
SET 1 PD METER 08/04/2022 JRC$100.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$150.00
PTO AND MECH ROUGH 01/24/2023 MLM$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,407.48
RESIDENTIAL FEE$121.17
RESIDENTIAL MECHANICAL FEE$159.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$263.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$2,427.00
WATER IMPACT FEE$2,168.00
AUTO PROCESSING FEE$179.19
AUTO PROCESSING FEE$1.20
PLAN REVIEW FEE$50.00
2NDS AND FRAMING 03/29/2023 PJF$30.00
2NDS AND FRAMING 03/31/2023 PJF$30.00
PTO AND MECH ROUGH 01/06/2023 SMH$30.00
GAS RELEASE 08/18/2023 SMH$30.00
PLUMB MECH FINAL 09/05/2023 SMH$30.00
PLUMB MECH FINAL 09/08/2023 SMH$30.00
UTILITIES INSPECTION 08/22/2023 TL$100.00
Total Fees:$10,872.84
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  SHEATHING RES
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)