Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/31/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01296
JOB ADDRESS:
10859 PRAIRIE ROSE RD
FRISCO, 75035
DESC:   2163 AC, 2748 SF, 2 STORY
OWNER:
LANDON HOMES
4050 W PARK BLVD
PLANO TX 75093

CONTRACTOR:
LANDON HOMES
4050 W PARK BLVD
PLANO TX 75093
ISSUED DATE:
3/31/2022
APPLIED DATE:
3/31/2022
EXPIRED DATE:
3/21/2023
SITE APN:
ADD279578
STATUS:
COMPLETED
APPLICANT:
Cherie Russell
4050 W Park Blvd
Plano TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
2NDS AND FRAMING 06/29/2022 CMM2$30.00
BRICKWALL TIES RES 08/05/2022 DC2$30.00
CREDIT CARD FEE$11.50
CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$2.60
PERCENT CREDIT CARD FEE$1.20
T-POLE RES 04/18/2022 JDR$30.00
UTILITIES INSPECTION 09/20/2022 NMN$100.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$971.80
RESIDENTIAL FEE$82.44
RESIDENTIAL MECHANICAL FEE$113.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$221.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,133.00
AUTO PROCESSING FEE$118.70
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
GAS RELEASE 08/29/2022 SDC$30.00
Total Fees:$7,221.84
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  T-POLE RES
______  SLAB RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  FIRE RATED WALL RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  LATH RES
______  GAS RELEASE
______  GAS RELEASE
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  TREE
______  MECHANICAL FINAL
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)