Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/29/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-01137
JOB ADDRESS:
15566 CRAPE MYRTLE RD
FRISCO, TX 75035
DESC:   2722 AC, 3337 SF, 2 STORY
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150
SAN DIEGO CA 92121-2061

CONTRACTOR:
AMERICAN LEGEND HOMES
2540 KING ARTHUR BLVD
LEWISVILLE TX 75056
ISSUED DATE:
3/29/2022
APPLIED DATE:
3/21/2022
EXPIRED DATE:
5/30/2023
SITE APN:
ADD280732
STATUS:
COMPLETED
APPLICANT:
Liliana Moton
4400 State Highway 121
Lewisville TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
ELECT FINAL RES 10/05/2022 JR2$30.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,174.58
RESIDENTIAL FEE$100.11
RESIDENTIAL MECHANICAL FEE$126.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$256.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$1,212.00
WATER IMPACT FEE$2,120.00
2NDS AND FRAMING 06/29/2022 RWK$30.00
WATER METER DEPOSIT$125.00
1 INCH PD METER$450.00
UTILITIES INSPECTION 10/27/2022 TL$100.00
REPLACE READABLE REGISTER$310.00
UTILITIES INSPECTION 10/21/2022 TL$100.00
INSULATION RES 07/22/2022 RWT$30.00
PERCENT CREDIT CARD FEE$2.00
PERCENT CREDIT CARD FEE$10.00
Total Fees:$6,501.69
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  FLATWORK RES
______  INSULATION RES
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  ELECT FINAL RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)