BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/14/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00814
|
JOB ADDRESS: 12241 FARMSTEAD DR FRISCO, TX 75033 |
DESC:
7260 AC, 8966 SF, 2 STORY |
|
OWNER:
NEWMAN VILLAGE CONSTRUCTION LLC
9801 CAMFIELD WAY FRISCO TX 75033
|
CONTRACTOR:
PREMIER RENOVATIONS INC dba RON DAVIS CUSTOM HOMES
17818 DAVENPORT RD STE 116 DALLAS TX 75252
|
ISSUED DATE: 3/14/2022
APPLIED DATE:3/11/2022
EXPIRED DATE:9/8/2024
SITE APN:ADD191044
STATUS:COMPLETED
|
|
APPLICANT:
Ron Davis
17818 Davenport Rd Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECT RELEASE RES 09/11/2023 DC2 | $30.00 |
ELECT RELEASE RES 09/12/2023 DP2 | $30.00 |
FLATWORK RES 10/04/2023 DW2 | $30.00 |
CREDIT CARD FEE | $12.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $1.40 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PLUMB MECH FINAL 02/12/2024 JR2 | $30.00 |
PLUMBING ROUGH-IN 04/15/2022 JWI | $30.00 |
PLUMBING ROUGH-IN 04/18/2022 JWI | $30.00 |
PLUMBING ROUGH-IN 05/09/2022 JWI | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
REPLACEMENT CARD FEE | $10.00 |
AUTO PROCESSING FEE | $2.25 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $2,801.16 |
RESIDENTIAL FEE | $268.98 |
RESIDENTIAL MECHANICAL FEE | $185.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $333.00 |
SEWER IMPACT FEE | $2,294.00 |
THOROUGHFARE IMPACT FEE | $5,322.00 |
WATER IMPACT FEE | $3,085.00 |
AUTO PROCESSING FEE | $286.19 |
T-POLE RES 04/12/2022 RWK | $30.00 |
T-POLE RES 06/06/2022 RWT | $30.00 |
PTO AND MECH ROUGH 02/16/2023 SDC | $30.00 |
PTO AND MECH ROUGH 02/21/2023 SDC | $30.00 |
PTO AND MECH ROUGH 02/27/2023 SDC | $30.00 |
GAS RELEASE 09/14/2023 SME2 | $30.00 |
GAS RELEASE 09/21/2023 SME2 | $30.00 |
UTILITIES INSPECTION 12/27/2023 TL | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $16,060.88 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ T-POLE RES |
______ T-POLE RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ LATH RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT RELEASE RES |
______ ELECT RELEASE RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|