Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/8/2022 PERMIT SUB-TYPE: MNEW PERMIT NO: B22-00628
JOB ADDRESS:
15201 PLEASANT RIDGE WAY
FRISCO, TX 75033
DESC:   446949 SF, THE LINKS ON PGA PARKWAY
OWNER:
FRISCO ROCKHILL LAND LP

DALLAS TX 75248-1196

CONTRACTOR:
CARBON LANDMARK CONSTRUCTION, LTD
17120 DALLAS PKWY STE 101
DALLAS TX 75248
ISSUED DATE:
8/8/2022
APPLIED DATE:
2/11/2022
EXPIRED DATE:
12/30/2024
SITE APN:
ADD302746
STATUS:
ISSUED
APPLICANT:
Robert Gamboa
4121 Commerce Street, Suite 1
Dallas TX 75228
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
45000000
FEE SUMMARY
INSPECTION SUMMARY
FIREINSULATION 10/19/2023 DMJ$50.00
LATH COMM 04/03/2023 DWF$35.00
FRAME COMM 04/27/2023 DWF$35.00
FRAME COMM 05/01/2023 DWF$35.00
FRAME COMM 05/04/2023 DWF$35.00
FRAME COMM 05/16/2023 DWF$35.00
DRYWALL COMM 05/25/2023 DWF$35.00
DRYWALL COMM 06/02/2023 DWF$35.00
DRYWALL COMM 06/19/2023 DWF$35.00
BRICKWALL TIE COMM 06/28/2023 DWF$35.00
FRAME COMM 06/29/2023 DWF$35.00
FRAME COMM 06/30/2023 DWF$35.00
FRAME COMM 07/07/2023 DWF$35.00
PERCENT CREDIT CARD FEE$2.70
PERCENT CREDIT CARD FEE$0.70
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$359.40
PERCENT CREDIT CARD FEE$2.70
PERCENT CREDIT CARD FEE$4.10
PERCENT CREDIT CARD FEE$3.50
PERCENT CREDIT CARD FEE$1.40
PERCENT CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$1.70
PERCENT CREDIT CARD FEE$2.10
PERCENT CREDIT CARD FEE$2.80
PERCENT CREDIT CARD FEE$1.00
COMM BUILDING PERMIT FEE$50.00
FRAME COMM 05/22/2023 JDW2$35.00
4 INCH COMP METER$3,600.00
WATER METER DEPOSIT COMMERCIAL$3,300.00
4 INCH COMP METER$3,600.00
3 INCH COMP METER$2,700.00
4 INCH COMP METER$3,600.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
FAILURE TO SHOW FEE$50.00
PLUMBING FINAL 12/04/2023 MLM$35.00
AUTO PROCESSING FEE$6.00
COMMERCIAL FEE$17,907.96
COMMERCIAL BUILDING PERMIT FEE$86,227.14
COMMERCIAL MECHANICAL FEE$22,377.45
COMMERCIAL NEW APPLICATION FEE$300.00
COMMERCIAL PLUMBING FEE$40,255.41
SEWER IMPACT FEE$143,964.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$139,894.00
SHEATHING COMM 03/20/2023 RWK$35.00
FOOTINGS COMM 10/05/2022 RWT$30.00
ELECT ROUGH COMM 11/28/2022 RWT$35.00
SHEATHING COMM 02/07/2023 RWT$35.00
FRAME COMM 07/11/2023 RWT$35.00
DRYWALL COMM 08/03/2023 RWT$35.00
BRICKWALL TIE COMM 08/07/2023 RWT$35.00
BRICKWALL TIE COMM 08/11/2023 RWT$35.00
ELECT FINAL COMM 09/27/2023 RWT$35.00
BUILDING FINAL 10/10/2023 RWT$35.00
LIFESAFETY 11/30/2023 RWT$35.00
LIFESAFETY 12/08/2023 RWT$35.00
LIFESAFETY 12/15/2023 RWT$35.00
LIFESAFETY 12/18/2023 RWT$35.00
LIFESAFETY 02/27/2024 RWT$35.00
LIFESAFETY 03/05/2024 RWT$35.00
PLUMB TOP OUT COMM 04/14/2023 SDC$35.00
PLUMB TOP OUT COMM 04/17/2023 SDC$35.00
PLUMB TOP OUT COMM 04/19/2023 SDC$35.00
PLUMB TOP OUT COMM 04/21/2023 SDC$35.00
MECHANICAL ROUGH 04/21/2023 SDC$35.00
MECHANICAL ROUGH 04/25/2023 SDC$35.00
MECHANICAL ROUGH 04/26/2023 SDC$30.00
MECHANICAL ROUGH 05/05/2023 SDC$30.00
PLUMBING FINAL 10/17/2023 SME2$35.00
PLUMB TOP OUT COMM 09/21/2023 SMH$35.00
MECHANICAL ROUGH 09/29/2023 SMH$35.00
Total Fees:$470,791.36
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  FOOTINGS COMM
______  UNDERGROUND ELEC
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FOOTINGS COMM
______  SLAB COMM
______  CMUWALL
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  CMUWALL
______  CMUWALL
______  ELECT ROUGH COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT RELEASE COMM
______  SHEATHING COMM
______  CMUWALL
______  SHEATHING COMM
______  SHEATHING COMM
______  CMUWALL
______  CEILING
______  SHEATHING COMM
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  LATH COMM
______  ELECT ROUGH COMM
______  LATH COMM
______  SHEATHING COMM
______  LATH COMM
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  T-POLE COMM
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  LATH COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  SET 3IN CMPND METER
______  SET 4IN CMPND METER
______  SET 4IN CMPND METER
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  SET 3IN CMPND METER
______  SET 4IN CMPND METER
______  SET 4IN CMPND METER
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  LATH COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  FRAME COMM
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  FRAME COMM
______  FIREINSULATION
______  FIREINSULATION
______  INSULATION COMM
______  FRAME COMM
______  INSULATION COMM
______  FRAME COMM
______  FRAME COMM
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  LATH COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  FIREINSULATION
______  INSULATION COMM
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  FRAME COMM
______  LATH COMM
______  SHEATHING COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  FRAME COMM
______  FRAME COMM
______  FIREINSULATION
______  INSULATION COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  FRAME COMM
______  FRAME COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  LATH COMM
______  BRICKWALL TIE COMM
______  SHEATHING COMM
______  FRAME COMM
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  LATH COMM
______  FIREINSULATION
______  DRYWALL COMM
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  SET 4IN CMPND METER
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  BRICKWALL TIE COMM
______  LATH COMM
______  INSULATION COMM
______  FRAME COMM
______  PIER COMM
______  FLATWORK COMM
______  FRAME COMM
______  FRAME COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  FRAME COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  DRYWALL COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  FLATWORK COMM
______  INSULATION COMM
______  FIREINSULATION
______  FLATWORK COMM
______  INSULATION COMM
______  LATH COMM
______  FRAME COMM
______  FLATWORK COMM
______  PIER COMM
______  DRYWALL COMM
______  FIREINSULATION
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  FLATWORK COMM
______  LATH COMM
______  MECHANICAL FINAL
______  DRYWALL COMM
______  SHEATHING COMM
______  PLUMBING FINAL
______  PIER COMM
______  MECHANICAL FINAL
______  PLUMB TOP OUT COMM
______  ELECT FINAL COMM
______  SHEATHING COMM
______  PLUMB TOP OUT COMM
______  LATH COMM
______  ELECT FINAL COMM
______  DRYWALL COMM
______  MECHANICAL ROUGH
______  BRICKWALL TIE COMM
______  ELECT FINAL COMM
______  BRICKWALL TIE COMM
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  ELECT RELEASE COMM
______  ELECT ROUGH COMM
______  MECHANICAL ROUGH
______  LATH COMM
______  ELECT ROUGH COMM
______  ELECT RELEASE COMM
______  FIRE FINAL
______  FIRE FINAL
______  CEILING
______  FLATWORK COMM
______  BRICKWALL TIE COMM
______  MECHANICAL ROUGH
______  BUILDING FINAL
______  FLATWORK COMM
______  FRAME COMM
______  BUILDING FINAL
______  ELECT ROUGH COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  FLATWORK COMM
______  BUILDING FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FRAME COMM
______  PLUMBING FINAL
______  FIREINSULATION
______  ELEVATOR
______  INSULATION COMM
______  LIFESAFETY
______  FIREINSULATION
______  FIRE FINAL
______  FIRE FINAL
______  COMM CO
______  INSULATION COMM
______  LATH COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  COMM CO
______  ELECT ROUGH COMM
______  FIREINSULATION
______  INSULATION COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  ELECT RELEASE COMM
______  LATH COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  FLATWORK COMM
______  INSULATION COMM
______  LATH COMM
______  ELECT FINAL COMM
______  FLATWORK COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  ELECT ROUGH COMM
______  FIRE FINAL
______  FIRE FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  DRYWALL COMM
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  ELECT ROUGH COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  LIFESAFETY
______  ELECT FINAL COMM
______  FLATWORK COMM
______  ELECT ROUGH COMM
______  LATH COMM
______  LIFESAFETY
______  LIFESAFETY
______  LIFESAFETY
______  FIRE FINAL
______  FIRE FINAL
______  COMM CO
______  PLUMBING FINAL
______  FRAME COMM
______  FLATWORK COMM
______  FRAME COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  INSULATION COMM
______  FLATWORK COMM
______  LIFESAFETY
______  LIFESAFETY
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  INSULATION COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT RELEASE COMM
______  FIREINSULATION
______  FIRE FINAL
______  LIFESAFETY
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  LIFESAFETY
______  FIRE FINAL
______  LIFESAFETY
______  COMM CO
______  PIER COMM
______  INSULATION COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELEVATOR
______  FIRE FINAL
______  DRYWALL COMM
______  DRYWALL COMM
______  FLATWORK COMM
______  FLATWORK COMM
______  COMM CO
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  PIER COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  ELEVATOR
______  ELEVATOR
______  ELECT FINAL COMM
______  LIFESAFETY
______  LIFESAFETY
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  FIRE FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  LIFESAFETY
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  LIFESAFETY
______  LIFESAFETY
______  LIFESAFETY
______  LIFESAFETY
______  COMM CO
______  ELECT ROUGH COMM
______  ELECT FINAL COMM
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)