|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/4/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00623
|
JOB ADDRESS: 16876 MAPLE BEND DR FRISCO, TX 75035 |
DESC:
2842 AC, 3538 SF, 2 STOR |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
BEAZER HOMES
1501 LBJ FREEWAY #300 FARMERS BRANCH TX 75234
|
ISSUED DATE: 4/4/2022
APPLIED DATE:3/30/2022
EXPIRED DATE:9/23/2023
SITE APN:ADD269989
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Allen
1501 LBJ Freeway Suite 300 Dallas TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB RES 05/09/2022 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
SHEATHING RES 06/06/2022 DC2 | $30.00 |
2NDS AND FRAMING 07/27/2022 DC2 | $30.00 |
GAS RELEASE 02/10/2023 DOT | $30.00 |
2NDS AND FRAMING 08/15/2022 DW2 | $30.00 |
DRYWALL RES 09/12/2022 DW2 | $30.00 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
SHEATHING RES 06/14/2022 JR2 | $30.00 |
CO AND BUILD FINAL 03/27/2023 JR2 | $30.00 |
SET 1 PD METER 04/15/2022 JRC | $100.00 |
PTO AND MECH ROUGH 07/15/2022 JWI | $30.00 |
PTO AND MECH ROUGH 07/19/2022 JWI | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,242.54 |
RESIDENTIAL FEE | $106.14 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $228.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
ELECT FINAL RES 02/10/2023 PJF | $30.00 |
2NDS AND FRAMING 08/04/2022 RWT | $30.00 |
BRICKWALL TIES RES 01/05/2023 RWT | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $150.00 |
Total Fees: | $10,125.38 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|