|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/18/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00421
|
JOB ADDRESS: 2027 TEMPERENCE HILL DR FRISCO, TX 75034 |
DESC:
3939 AC, 4938 SF, 2 STORY |
|
OWNER:
SILVERLEAF TOWER LP
15400 KNOLL TRAIL DR STE 230 DALLAS TX 75248
|
CONTRACTOR:
GRAND HOMES
15455 DALLAS PKWY STE 1000 ADDISON TX 75001
|
ISSUED DATE: 2/18/2022
APPLIED DATE:2/11/2022
EXPIRED DATE:10/3/2023
SITE APN:ADD240408
STATUS:COMPLETED
|
|
APPLICANT:
Linda Sanville
15455 Dallas Parkway # 1000 Addison TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 02/08/2023 CI | $30.00 |
PLUMB MECH FINAL 02/21/2023 CI | $30.00 |
PLUMB MECH FINAL 03/21/2023 CI | $30.00 |
CO AND BUILD FINAL 04/04/2023 DC2 | $30.00 |
GAS RELEASE 12/02/2022 DOT | $30.00 |
ELECT FINAL RES 11/02/2022 DWF | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $4.00 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $3.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
SET 1 PD METER 03/04/2022 BSJ | $100.00 |
ELECT FINAL RES 11/04/2022 JDR | $30.00 |
PLUMBING ROUGH-IN 03/09/2022 JWI | $30.00 |
PLUMBING ROUGH-IN 03/11/2022 JWI | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 08/03/2022 MLM | $30.00 |
PTO AND MECH ROUGH 08/05/2022 MLM | $30.00 |
PLUMB MECH FINAL 01/17/2023 MRT | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,690.78 |
RESIDENTIAL FEE | $148.14 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $256.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,424.00 |
WATER IMPACT FEE | $2,203.00 |
AUTO PROCESSING FEE | $186.64 |
PLAN REVIEW FEE | $100.00 |
SLAB RES 03/29/2022 PJF | $30.00 |
PLUMB MECH FINAL 01/25/2023 SDC | $30.00 |
PLUMBING ROUGH-IN 03/10/2022 SMH | $30.00 |
PTO AND MECH ROUGH 07/15/2022 SMH | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
UTILITIES INSPECTION 11/10/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $11,624.86 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ LATH RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|