|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/1/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00201
|
JOB ADDRESS: 15577 DESERT BROOM RD FRISCO, TX 75035 |
DESC:
3707 AC, 54321 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150 SAN DIEGO CA 92121-2061
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 2/1/2022
APPLIED DATE:1/14/2022
EXPIRED DATE:5/20/2023
SITE APN:ADD281057
STATUS:COMPLETED
|
|
APPLICANT:
Justin Minikes
5601 Democracy Dr. Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMB MECH FINAL 11/02/2022 CI | $30.00 |
CO AND BUILD FINAL 11/18/2022 CMM2 | $30.00 |
PTO AND MECH ROUGH 07/08/2022 DOT | $30.00 |
SLAB RES 03/01/2022 DWF | $30.00 |
SLAB RES 03/02/2022 DWF | $30.00 |
SLAB RES 03/03/2022 DWF | $30.00 |
SLAB RES 03/04/2022 DWF | $30.00 |
CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.22 |
PERCENT CREDIT CARD FEE | $1.22 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.64 |
PERCENT CREDIT CARD FEE | $0.04 |
LATH RES 08/23/2022 JDR | $30.00 |
INSULATION RES 08/09/2022 JR2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,497.72 |
RESIDENTIAL FEE | $129.63 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $270.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,212.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $120.54 |
PLAN REVIEW FEE | $50.00 |
GAS RELEASE 09/23/2022 SDC | $30.00 |
Total Fees: | $6,762.51 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ FLATWORK RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ LATH RES |
______ LATH RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ TREE |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|