BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/25/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00200
|
JOB ADDRESS: 15783 DESERT BROOM RD FRISCO, TX 75035 |
DESC:
3748 AC, 4504 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150 SAN DIEGO CA 92121-2061
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DR. STE. 300 PLANO TX 75024
|
ISSUED DATE: 1/25/2022
APPLIED DATE:1/25/2022
EXPIRED DATE:5/16/2023
SITE APN:ADD281080
STATUS:COMPLETED
|
|
APPLICANT:
Nathan Herrington
5601 Democracy Dr Ste 300 Plano TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECT FINAL RES 10/07/2022 CMM2 | $30.00 |
CO AND BUILD FINAL 11/17/2022 CMM2 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $11.50 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $3.20 |
PERCENT CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 07/29/2022 JDR | $30.00 |
INSULATION RES 08/12/2022 JDR | $30.00 |
DRYWALL RES 08/22/2022 JDR | $30.00 |
ELECT FINAL RES 10/06/2022 JR2 | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,556.24 |
RESIDENTIAL FEE | $135.12 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $306.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,212.00 |
WATER IMPACT FEE | $2,120.00 |
AUTO PROCESSING FEE | $111.17 |
AUTO PROCESSING FEE | $1.00 |
UTILITIES INSPECTION 10/25/2022 TL | $100.00 |
Total Fees: | $6,898.63 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ INSULATION RES |
______ LATH RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ LATH RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ MECHANICAL FINAL |
______ TREE |
______ MECHANICAL FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ TREE |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|