|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/22/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00170
|
JOB ADDRESS: 15554 CRAPE MYRTLE RD FRISCO, TX 75035 |
DESC:
3055 AC, 3855 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150 SAN DIEGO CA 92121-2061
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460 PLANO TX 75093
|
ISSUED DATE: 3/22/2022
APPLIED DATE:3/9/2022
EXPIRED DATE:5/14/2023
SITE APN:ADD280730
STATUS:COMPLETED
|
|
APPLICANT:
Tracy Cooper
2400 Dallas Parkway Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.22 |
PERCENT CREDIT CARD FEE | $1.22 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $0.04 |
SLAB RES 04/28/2022 GLQ | $30.00 |
SLAB RES 05/02/2022 GLQ | $30.00 |
FLATWORK RES 09/19/2022 JDR | $30.00 |
PLUMBING ROUGH-IN 04/18/2022 MLM | $30.00 |
PLUMBING ROUGH-IN 04/20/2022 MLM | $30.00 |
2NDS AND FRAMING 06/29/2022 RWK | $30.00 |
GAS RELEASE 09/30/2022 SDC | $30.00 |
UTILITIES INSPECTION 10/27/2022 TL | $100.00 |
WATER IMPACT FEE | $2,120.00 |
THOROUGHFARE IMPACT FEE | $1,212.00 |
SEWER IMPACT FEE | $0.00 |
RESIDENTIAL PLUMBING FEE | $243.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL FEE | $115.65 |
RESIDENTIAL NEW PERMIT FEE | $1,347.15 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $2.25 |
DRYWALL RES 08/08/2022 JDR | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PLAN REVIEW FEE | $50.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $450.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
Total Fees: | $6,481.13 |
|
|
| ______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|