|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/17/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00054
|
JOB ADDRESS: 15634 MOSSY OAK LN FRISCO, TX 75035 |
DESC:
2664 AC 3444 SF, 2 STORY |
|
OWNER:
FRISCO 113 LLC CTMGT
1800 VALLEY VIEW LN STE 300 DALLAS TX 75234-8945
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 1/17/2022
APPLIED DATE:1/14/2022
EXPIRED DATE:11/11/2023
SITE APN:ADD267443
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLAN REVIEW FEE | $50.00 |
GAS RELEASE 03/20/2023 DOT | $30.00 |
FLATWORK RES 03/22/2023 DWF | $30.00 |
CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SET 1 PD METER 02/21/2022 BSJ | $100.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PLAN REVIEW FEE | $10.00 |
AUTO PROCESSING FEE | $1.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,210.96 |
RESIDENTIAL FEE | $103.32 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
2NDS AND FRAMING 01/13/2023 PJF | $30.00 |
2NDS AND FRAMING 01/18/2023 PJF | $30.00 |
GAS RELEASE 04/11/2023 SDC | $30.00 |
PTO AND MECH ROUGH 10/11/2022 SME2 | $30.00 |
PTO AND MECH ROUGH 11/09/2022 SME2 | $30.00 |
PTO AND MECH ROUGH 11/23/2022 SME2 | $30.00 |
PTO AND MECH ROUGH 10/19/2022 SMH | $30.00 |
Total Fees: | $5,882.88 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ SLAB RES |
______ WATER REGISTER |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|