|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/7/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B22-00046
|
JOB ADDRESS: 11269 FOUR ROSES TRL FRISCO, TX 75035 |
DESC:
2857 AC, 3549 SF, 2 STORY |
|
OWNER:
LLC TSHH
2805 DALLAS PKWY STE 400 PLANO TX 75093-8722
|
CONTRACTOR:
TSHH, LLC
2805 N. DALLAS PKWY, SUITE 400 PLANO TX 75093
|
ISSUED DATE: 1/7/2022
APPLIED DATE:1/7/2022
EXPIRED DATE:4/15/2023
SITE APN:ADD236060
STATUS:COMPLETED
|
|
APPLICANT:
Elizabeth Reyes
18111 Preston Road #610 Dallas TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRYWALL RES 06/17/2022 CMM2 | $30.00 |
DRYWALL RES 06/21/2022 CMM2 | $30.00 |
DRYWALL RES 06/22/2022 CMM2 | $30.00 |
CREDIT CARD FEE | $11.50 |
CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $1.80 |
PERCENT CREDIT CARD FEE | $12.00 |
2NDS AND FRAMING 05/19/2022 JDR | $30.00 |
2NDS AND FRAMING 05/23/2022 JDR | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,246.17 |
RESIDENTIAL FEE | $106.47 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $207.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,174.00 |
AUTO PROCESSING FEE | $124.74 |
2NDS AND FRAMING 05/18/2022 REED | $30.00 |
PLUMBING ROUGH-IN 02/21/2022 SMH | $30.00 |
UTILITIES INSPECTION 09/30/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
Total Fees: | $8,080.58 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ GAS RELEASE |
______ PLUMBING ROUGH-IN |
______ GAS RELEASE |
______ PLUMBING ROUGH-IN |
______ FLATWORK RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|