Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/13/2022 PERMIT SUB-TYPE: SNEW PERMIT NO: B22-00043
JOB ADDRESS:
11411 OREGON TRL
FRISCO, TX 75035
DESC:   4407 AC, 5106 SF, 2 STORY
OWNER:
TEXAS HOMES INC FIRST
500 CRESCENT CT STE 350
DALLAS TX 75201-7854

CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
500 CRESCENT CT STE 350
DALLAS TX 75201
ISSUED DATE:
1/13/2022
APPLIED DATE:
1/12/2022
EXPIRED DATE:
8/28/2023
SITE APN:
ADD279864
STATUS:
COMPLETED
APPLICANT:
Ana Gutierrez
500 Crescent Court, Suite 350
Dallas TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
2NDS AND FRAMING 07/21/2022 DC2$30.00
BRICKWALL TIES RES 10/31/2022 DC2$30.00
2NDS AND FRAMING 08/04/2022 DW2$30.00
2NDS AND FRAMING 08/10/2022 DW2$30.00
DRYWALL RES 09/07/2022 DW2$30.00
2NDS AND FRAMING 08/03/2022 DWF$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$10.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.00
PERCENT CREDIT CARD FEE$0.00
PERCENT CREDIT CARD FEE$0.60
REPLACE READABLE REGISTER$500.00
REPLACEMENT CARD FEE$10.00
PTO AND MECH ROUGH 07/15/2022 JWI$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
AUTO PROCESSING FEE$0.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,747.80
RESIDENTIAL FEE$153.78
RESIDENTIAL MECHANICAL FEE$146.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$256.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$826.00
WATER IMPACT FEE$2,208.00
PLAN REVIEW FEE$50.00
BRICKWALL TIES RES 11/02/2022 PJF$30.00
SLAB RES 02/18/2022 REED$30.00
BRICKWALL TIES RES 10/24/2022 RWK$30.00
Total Fees:$9,452.58
______  T-POLE RES
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  WATER REGISTER
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  DRYWALL RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  BRICKWALL TIES RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)