|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/18/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-06024
|
JOB ADDRESS: 3278 MIDWICK DR FRISCO, TX 75034 |
DESC:
5170 AC, 7037 SF, 2 STORY |
|
OWNER:
ELLIOTTE J DUNLAP
5516 EAGLE RIVER DR THE COLONY TX 75056
|
CONTRACTOR:
J ANTHONY CUSTOM HOMES LLC
1680 JAN MARIE DRIVE LUCAS TX 75002
|
ISSUED DATE: 2/18/2022
APPLIED DATE:12/21/2021
EXPIRED DATE:4/24/2024
SITE APN:ADD182668
STATUS:COMPLETED
|
|
APPLICANT:
Jennifer White
1680 Jan Marie Drive Lucas TX 75002
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK RES 06/23/2023 DW2 | $30.00 |
FLATWORK RES 07/18/2023 DW2 | $30.00 |
SLAB RES 05/10/2022 DWF | $30.00 |
SLAB RES 05/12/2022 DWF | $30.00 |
SLAB RES 05/16/2022 DWF | $30.00 |
SLAB RES 05/17/2022 DWF | $30.00 |
SLAB RES 05/19/2022 DWF | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 12/02/2022 JDR | $30.00 |
BRICKWALL TIES RES 01/03/2023 JDR | $30.00 |
RESIDENTIAL PLUMBING FEE | $249.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER IMPACT FEE | $2,177.00 |
PLUMB MECH FINAL 04/05/2023 SMH | $30.00 |
UTILITIES INSPECTION 10/13/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL MECHANICAL FEE | $152.50 |
RESIDENTIAL FEE | $211.89 |
RESIDENTIAL NEW PERMIT FEE | $2,306.38 |
FENCE FEE | $20.00 |
AUTO PROCESSING FEE | $6.00 |
PERCENT CREDIT CARD FEE | $0.60 |
ELECT FINAL RES 04/04/2023 DW2 | $30.00 |
CREDIT CARD FEE | $12.00 |
FLATWORK RES 07/13/2023 RWK | $30.00 |
SHEATHING RES 10/21/2022 JDW2 | $30.00 |
2NDS AND FRAMING 11/30/2022 JDR | $30.00 |
2NDS AND FRAMING 11/28/2022 JDR | $30.00 |
PERCENT CREDIT CARD FEE | $12.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
INSULATION RES 12/29/2022 DWF | $30.00 |
FLATWORK RES 08/10/2023 DP2 | $30.00 |
DRYWALL RES 01/17/2023 CMM2 | $30.00 |
DRYWALL RES 01/12/2023 CMM2 | $30.00 |
WATER METER DEPOSIT | $150.00 |
1 INCH PD METER | $450.00 |
AUTO PROCESSING FEE | $134.72 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $1.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
2NDS AND FRAMING 11/10/2022 DWF | $30.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
PERCENT CREDIT CARD FEE | $2.40 |
ELECT FINAL RES 03/31/2023 DC2 | $30.00 |
Total Fees: | $9,043.09 |
|
|
| ______ T-POLE RES |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ ELECT ROUGH RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ SHEATHING RES |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ 2NDS AND FRAMING |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ TREE |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ TREE |
______ TREE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|