|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/12/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-05924
|
JOB ADDRESS: 8977 SWALLOWTAIL ST FRISCO, TX 75035 |
DESC:
1772 AC, 2321 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150 SAN DIEGO CA 92121-2061
|
CONTRACTOR:
CB JENI 2020 LLC
2805 DALLAS PARKWAY PLANO TX 75093
|
ISSUED DATE: 1/12/2022
APPLIED DATE:12/22/2021
EXPIRED DATE:3/22/2023
SITE APN:ADD281442
STATUS:COMPLETED
|
|
APPLICANT:
Melissa Graves
2805 Dallas Pkwy Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FIRE RATED WALL RES 04/07/2022 CMM2 | $30.00 |
CREDIT CARD FEE | $3.00 |
PERCENT CREDIT CARD FEE | $13.20 |
SHEATHING RES 04/12/2022 GLQ | $30.00 |
ELECT FINAL RES 08/31/2022 JDR | $30.00 |
PTO AND MECH ROUGH 05/13/2022 MLM | $30.00 |
PTO AND MECH ROUGH 05/26/2022 MLM | $30.00 |
PTO AND MECH ROUGH 05/27/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $818.77 |
RESIDENTIAL FEE | $69.63 |
RESIDENTIAL MECHANICAL FEE | $106.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $205.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $1,212.00 |
WATER IMPACT FEE | $2,120.00 |
GAS RELEASE 08/19/2022 SDC | $30.00 |
UTILITIES INSPECTION 09/09/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
Total Fees: | $6,259.10 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ FIRE RATED WALL RES |
______ FIRE RATED WALL RES |
______ SHEATHING RES |
______ SHEATHING RES |
______ FIRE RATED WALL RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ 2NDS AND FRAMING |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|