Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/2/2021 PERMIT SUB-TYPE: SNEW PERMIT NO: B21-05387
JOB ADDRESS:
11647 HUNDRED ACRE DR
FRISCO, 75035
DESC:   2337 AC, 2921 SF, 2 STORY
OWNER:



CONTRACTOR:
CB JENI 2020 LLC
2805 DALLAS PARKWAY
PLANO TX 75093
ISSUED DATE:
12/2/2021
APPLIED DATE:
11/19/2021
EXPIRED DATE:
2/11/2023
SITE APN:
ADD236385
STATUS:
COMPLETED
APPLICANT:
Melissa Graves
2805 Dallas Pkwy
Plano TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
PERCENT CREDIT CARD FEE$0.60
PTO AND MECH ROUGH 04/08/2022 JWI$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$1,032.35
RESIDENTIAL FEE$87.63
RESIDENTIAL MECHANICAL FEE$139.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$213.00
SEWER IMPACT FEE$2,344.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$2,174.00
Total Fees:$6,922.08
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  FIRE RATED WALL RES
______  SHEATHING RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  BRICKWALL TIES RES
______  2NDS AND FRAMING
______  INSULATION RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)