|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/12/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-05261
|
JOB ADDRESS: 16553 MAPLE BEND DR FRISCO, TX 75035 |
DESC:
3043 AC, 3739 SF, 2 STORY |
|
OWNER:
FRISCO PROPERTY LLC 124
1605 LBJ FWY STE 700 DALLAS TX 75234-6099
|
CONTRACTOR:
BEAZER HOMES
1501 LBJ FREEWAY #300 FARMERS BRANCH TX 75234
|
ISSUED DATE: 1/12/2022
APPLIED DATE:1/3/2022
EXPIRED DATE:2/20/2023
SITE APN:ADD269962
STATUS:COMPLETED
|
|
APPLICANT:
Jamie Allen
1501 LBJ Freeway Suite 300 Dallas TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS AND FRAMING 05/09/2022 CMM2 | $30.00 |
INSULATION RES 05/19/2022 CMM2 | $30.00 |
DRYWALL RES 05/26/2022 CMM2 | $30.00 |
DRYWALL RES 05/31/2022 DC2 | $30.00 |
DRYWALL RES 06/01/2022 DC2 | $30.00 |
FLATWORK RES 06/20/2022 DC2 | $30.00 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $12.00 |
SLAB RES 02/09/2022 JDR | $30.00 |
SLAB RES 02/10/2022 JDR | $30.00 |
SLAB RES 02/11/2022 JDR | $30.00 |
SET 1 PD METER 01/25/2022 JRC | $100.00 |
GAS RELEASE 07/06/2022 JWI | $30.00 |
PLUMBING ROUGH-IN 01/28/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $6.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,308.87 |
RESIDENTIAL FEE | $112.17 |
RESIDENTIAL MECHANICAL FEE | $133.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $2,427.00 |
WATER IMPACT FEE | $2,168.00 |
ELECT FINAL RES 08/02/2022 RWK | $30.00 |
PTO AND MECH ROUGH 04/28/2022 SDC | $30.00 |
UTILITIES INSPECTION 08/12/2022 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
Total Fees: | $10,732.24 |
|
|
| ______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ TREE |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ SHEATHING RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ BRICKWALL TIES RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|