Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/29/2021 PERMIT SUB-TYPE: SNEW PERMIT NO: B21-05120
JOB ADDRESS:
15674 MOSSY OAK LN
FRISCO, 75035
DESC:   2443 AC, 3047 SF, 2 STORY
OWNER:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700
Dallas TX 75201

CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700
Dallas TX 75201
ISSUED DATE:
10/29/2021
APPLIED DATE:
10/26/2021
EXPIRED DATE:
11/11/2023
SITE APN:
ADD267445
STATUS:
COMPLETED
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700
Dallas TX 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
REPLACEMENT CARD FEE$10.00
2NDS AND FRAMING 01/09/2023 DWF$30.00
FLATWORK RES 03/22/2023 DWF$30.00
FLATWORK RES 03/30/2023 DWF$30.00
CREDIT CARD FEE$0.20
CREDIT CARD FEE$1.00
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.20
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$8.20
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
PLAN REVIEW FEE$10.00
AUTO PROCESSING FEE$1.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
2NDS AND FRAMING 01/18/2023 PJF$30.00
2NDS AND FRAMING 01/23/2023 PJF$30.00
PTO AND MECH ROUGH 12/09/2022 SDC$30.00
GAS RELEASE 04/11/2023 SDC$30.00
PTO AND MECH ROUGH 10/11/2022 SME2$30.00
PTO AND MECH ROUGH 11/09/2022 SME2$30.00
PTO AND MECH ROUGH 11/22/2022 SME2$30.00
UTILITIES INSPECTION 04/25/2023 TL$100.00
REPLACE READABLE REGISTER$310.00
WATER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$2,344.00
RESIDENTIAL PLUMBING FEE$242.00
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL MECHANICAL FEE$119.50
RESIDENTIAL FEE$91.41
RESIDENTIAL NEW PERMIT FEE$1,075.98
FENCE FEE$20.00
AUTO PROCESSING FEE$6.00
Total Fees:$5,620.49
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  SLAB RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  BRICKWALL TIES RES
______  DRYWALL RES
______  DRYWALL RES
______  GAS RELEASE
______  GAS RELEASE
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  GAS RELEASE
______  ELECT FINAL RES
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)