|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/21/2022
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-05092
|
JOB ADDRESS: 15548 CRAPE MYRTLE RD FRISCO, TX 75035 |
DESC:
2918 AC, 3475 SF, 2 STORY |
|
OWNER:
FM 3537 LLC NASH
4790 EASTGATE MALL STE 150 SAN DIEGO CA 92121-2061
|
CONTRACTOR:
SHADDOCK HOMES LTD
2400 DALLAS PKWY STE 460 PLANO TX 75093
|
ISSUED DATE: 1/21/2022
APPLIED DATE:1/13/2022
EXPIRED DATE:5/3/2023
SITE APN:ADD280729
STATUS:COMPLETED
|
|
APPLICANT:
Tracy Cooper
2400 Dallas Parkway Plano TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.04 |
PERCENT CREDIT CARD FEE | $2.04 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PTO AND MECH ROUGH 05/11/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $2.25 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,221.50 |
RESIDENTIAL FEE | $104.25 |
RESIDENTIAL MECHANICAL FEE | $146.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $235.00 |
SEWER IMPACT FEE | $2,366.00 |
THOROUGHFARE IMPACT FEE | $4,257.00 |
WATER IMPACT FEE | $2,264.00 |
AUTO PROCESSING FEE | $1.00 |
PLAN REVIEW FEE | $50.00 |
SLAB RES 03/24/2022 RWK | $30.00 |
UTILITIES INSPECTION 10/14/2022 TL | $100.00 |
Total Fees: | $11,707.28 |
|
|
| ______ METER PAYMENT |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ SLAB RES |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ BRICKWALL TIES RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ UTILITIES INSPECTION |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|