APPROVED DATE: 1/20/2022 PERMIT SUB-TYPE: MNEW PERMIT NO: B21-04696
JOB ADDRESS:
4501 SAMUEL WAY
FRISCO, TX 75033
DESC:   365199 SF, NEWMAN PLACE
OWNER:
SPECIFIED PROPERTIES LXXIX LP

FRISCO TX 75034

CONTRACTOR:
WESTWOOD RESIDENTIAL BUILDERS
3198 PARKWOOD BLVD
FRISCO TX 75034
ISSUED DATE:
1/20/2022
APPLIED DATE:
9/27/2021
EXPIRED DATE:
11/24/2024
SITE APN:
ADD297945
STATUS:
COMPLETED
APPLICANT:
lial wagner
3198 Parkwood Blvd. , ste11076
Frisco TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
45000000
FEE SUMMARY
INSPECTION SUMMARY
T-POLE COMM 11/15/2022 DC2$30.00
FRAME COMM 03/03/2023 DC2$35.00
DRYWALL COMM 03/22/2023 DC2$30.00
FRAME COMM 03/31/2023 DC2$35.00
DRYWALL COMM 04/04/2023 DC2$30.00
ELECT ROUGH COMM 04/10/2023 DC2$30.00
DRYWALL COMM 04/19/2023 DC2$35.00
FRAME COMM 05/12/2023 DC2$35.00
DRYWALL COMM 05/15/2023 DC2$35.00
BRICKWALL TIE COMM 05/15/2023 DC2$35.00
BRICKWALL TIE COMM 05/18/2023 DC2$35.00
FRAME COMM 05/24/2023 DC2$35.00
FRAME COMM 05/30/2023 DC2$30.00
FRAME COMM 07/06/2023 DC2$35.00
INSULATION COMM 08/01/2023 DC2$35.00
ELECT FINAL COMM 08/14/2023 DC2$35.00
PERCENT CREDIT CARD FEE$2.00
PERCENT CREDIT CARD FEE$3.20
PERCENT CREDIT CARD FEE$3.50
PERCENT CREDIT CARD FEE$7.50
PERCENT CREDIT CARD FEE$12.10
REPLACE READABLE REGISTER$310.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
2 INCH T-10 METER$4,000.00
WATER METER DEPOSIT COMMERCIAL$4,400.00
AUTO PROCESSING FEE$6.00
COMMERCIAL FEE$14,637.96
COMMERCIAL BUILDING PERMIT FEE$86,227.14
COMMERCIAL MECHANICAL FEE$18,289.95
COMMERCIAL NEW APPLICATION FEE$300.00
COMMERCIAL PLUMBING FEE$32,897.91
SEWER IMPACT FEE$92,998.00
THOROUGHFARE IMPACT FEE$185,996.00
WATER IMPACT FEE$92,998.00
PLUMB TOP OUT COMM 03/10/2023 SDC$35.00
PLUMBING ROUGH-IN 03/30/2023 SDC$35.00
2 INCH T-10 METER$2,475.00
WATER METER DEPOSIT COMMERCIAL$3,300.00
Total Fees:$539,969.26
______  FOOTINGS COMM
______  FOOTINGS COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  FOOTINGS COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  T-POLE COMM
______  T-POLE COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  BRICKWALL TIE COMM
______  PLUMBING ROUGH-IN
______  FOOTINGS COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  TILT WALL PANELS
______  PAVING
______  PAVING
______  ELECT ROUGH COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PAVING
______  SLAB COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  PAVING
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  PAVING
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  SLAB COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECT ROUGH COMM
______  SLAB COMM
______  FIRELANE INSPECTION
______  PLUMBING ROUGH-IN
______  CMUWALL
______  PLUMBING ROUGH-IN
______  SLAB COMM
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  SLAB COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  T-POLE COMM
______  T-POLE COMM
______  T-POLE COMM
______  T-POLE COMM
______  T-POLE COMM
______  T-POLE COMM
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SHEATHING COMM
______  PLUMBING ROUGH-IN
______  FRAME COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  SHEATHING COMM
______  SLAB COMM
______  PAVING
______  SLAB COMM
______  ELECT ROUGH COMM
______  SLAB COMM
______  PAVING
______  PAVING
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  SHEATHING COMM
______  SLAB COMM
______  SHEATHING COMM
______  SLAB COMM
______  CEILING
______  SLAB COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  CMUWALL
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  CMUWALL
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  CEILING
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  SLAB COMM
______  SHEATHING COMM
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  FRAME COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  CMUWALL
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  CEILING
______  PAVING
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  METER PAYMENT
______  DRYWALL COMM
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  FIREINSULATION
______  FIREINSULATION
______  MECHANICAL ROUGH
______  CEILING
______  BRICKWALL TIE COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FIREINSULATION
______  MECHANICAL ROUGH
______  SHEATHING COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  INSULATION COMM
______  SHEATHING COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  DRYWALL COMM
______  PLUMBING ROUGH-IN
______  MECHANICAL ROUGH
______  INSULATION COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  CEILING
______  INSULATION COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FRAME COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  BRICKWALL TIE COMM
______  SHEATHING COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  DRYWALL COMM
______  FIREINSULATION
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  CEILING
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  ELECT ROUGH COMM
______  PLUMB TOP OUT COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  FRAME COMM
______  FIREINSULATION
______  DRYWALL COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  SHEATHING COMM
______  SHEATHING COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  SHEATHING COMM
______  CEILING
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  INSULATION COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  FOOTINGS COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  INSULATION COMM
______  FRAME COMM
______  FRAME COMM
______  INSULATION COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  INSULATION COMM
______  ELECT RELEASE COMM
______  INSULATION COMM
______  WATER REGISTER
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  INSULATION COMM
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  FRAME COMM
______  INSULATION COMM
______  FIREINSULATION
______  DRYWALL COMM
______  SHEATHING COMM
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  CEILING
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  DRYWALL COMM
______  PLUMB TOP OUT COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  CEILING
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  FRAME COMM
______  ELECT ROUGH COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  SHEATHING COMM
______  BRICKWALL TIE COMM
______  CEILING
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  WATER REGISTER
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  FIREINSULATION
______  MECHANICAL ROUGH
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  PLUMBING ROUGH-IN
______  INSULATION COMM
______  PLUMB TOP OUT COMM
______  BRICKWALL TIE COMM
______  BRICKWALL TIE COMM
______  ELECT RELEASE COMM
______  FRAME COMM
______  FIREINSULATION
______  SLAB COMM
______  DRYWALL COMM
______  INSULATION COMM
______  DRYWALL COMM
______  MECHANICAL ROUGH
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  PLUMB TOP OUT COMM
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  CEILING
______  ELECT RELEASE COMM
______  MECHANICAL ROUGH
______  MECHANICAL FINAL
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  INSULATION COMM
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  INSULATION COMM
______  FIREINSULATION
______  PLUMB TOP OUT COMM
______  MECHANICAL FINAL
______  FOOTINGS COMM
______  BRICKWALL TIE COMM
______  PLUMB TOP OUT COMM
______  MECHANICAL ROUGH
______  ELECT FINAL COMM
______  INSULATION COMM
______  CEILING
______  FIREINSULATION
______  FOOTINGS COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  ELECT RELEASE COMM
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  FLATWORK COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT ROUGH COMM
______  FRAME COMM
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  DRYWALL COMM
______  MECHANICAL ROUGH
______  PLUMBING FINAL
______  CEILING
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  MECHANICAL ROUGH
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  FIREINSULATION
______  INSULATION COMM
______  MECHANICAL ROUGH
______  ELECT RELEASE COMM
______  FRAME COMM
______  ELECT ROUGH COMM
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  ELECT ROUGH COMM
______  ELECT ROUGH COMM
______  FRAME COMM
______  FRAME COMM
______  MEETING
______  ELECT FINAL COMM
______  MEETING
______  MECHANICAL FINAL
______  DRYWALL COMM
______  ELECT FINAL COMM
______  DRYWALL COMM
______  PLUMBING FINAL
______  FIREINSULATION
______  INSULATION COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL ROUGH
______  FRAME COMM
______  ELECT ROUGH COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  FIREINSULATION
______  INSULATION COMM
______  DRYWALL COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  ELECT RELEASE COMM
______  FIREINSULATION
______  DRYWALL COMM
______  INSULATION COMM
______  FIRE FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  DRYWALL COMM
______  FIREINSULATION
______  INSULATION COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  FLATWORK COMM
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECT FINAL COMM
______  ELECT RELEASE COMM
______  DRYWALL COMM
______  ELECT FINAL COMM
______  ELECT FINAL COMM
______  FLATWORK COMM
______  DRYWALL COMM
______  DRYWALL COMM
______  MECHANICAL FINAL
______  BUILDING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  BUILDING FINAL
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  ELECT RELEASE COMM
______  BUILDING FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  PLUMBING FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  BUILDING FINAL
______  BUILDING FINAL
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  FIRE FINAL
______  COMM CO
______  COMM CO
______  COMM CO
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  COMM CO
______  COMM CO
______  FIRE FINAL
______  FIRE FINAL
______  ELECT FINAL COMM
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  COMM CO
______  COMM CO
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  FIRE FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  COMM CO
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  ELECT FINAL COMM
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  BUILDING FINAL
______  COMM CO
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECT FINAL COMM
______  BUILDING FINAL
______  COMM CO
______  COMM CO
______  COMM CO
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)