|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/27/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-04315
|
JOB ADDRESS: 3658 SINGER LN FRISCO, TX 75034 |
DESC:
3793 AC, 4818 SF, 2 STORY |
|
OWNER:
HT STONEBROOK LAND I LP
2200 ROSS AVE STE 4200W DALLAS TX 75201
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
6735 SALT CEDAR WAY, BLDG 1, STE 200 FRISCO TX 75034
|
ISSUED DATE: 9/27/2021
APPLIED DATE:9/15/2021
EXPIRED DATE:2/19/2023
SITE APN:ADD221473
STATUS:COMPLETED
|
|
APPLICANT:
Dallas Starts - DH
6735 Salt Cedar Way Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE RES 11/04/2021 BC | $30.00 |
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 03/10/2022 DW2 | $30.00 |
2NDS AND FRAMING 03/15/2022 DW2 | $30.00 |
2NDS AND FRAMING 03/18/2022 DW2 | $30.00 |
INSULATION RES 03/24/2022 DW2 | $30.00 |
INSULATION RES 04/01/2022 DW2 | $30.00 |
CREDIT CARD FEE | $2.60 |
SET 1 PD METER 11/04/2021 JRC | $100.00 |
UTILITIES INSPECTION 07/15/2022 NMN | $100.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,653.58 |
RESIDENTIAL FEE | $144.54 |
RESIDENTIAL MECHANICAL FEE | $159.00 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $277.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $119.00 |
WATER IMPACT FEE | $2,151.00 |
ELECT FINAL RES 06/08/2022 PJF | $30.00 |
GAS RELEASE 06/27/2022 SDC | $30.00 |
GAS RELEASE 06/17/2022 SMH | $30.00 |
Total Fees: | $8,215.72 |
|
|
| ______ SET 1 PD METER |
______ T-POLE RES |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ INSULATION RES |
______ DRYWALL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ T-POLE RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ ELECT FINAL RES |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|