Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/6/2021 PERMIT SUB-TYPE: SNEW PERMIT NO: B21-04068
JOB ADDRESS:
1498 HILTON HEAD LN
FRISCO, TX 75034
DESC:   5866 AC, 6901 SF, 2 STORY
OWNER:
KAMRAN & MOORAT LAKHANI
4445 SAUKENUK LN
CARROLLTON TX 75010

CONTRACTOR:
MY CHOICE CUSTOM HOMES
1100 BUSINESS PARKWAY
Richardson TX 75081
ISSUED DATE:
10/6/2021
APPLIED DATE:
8/17/2021
EXPIRED DATE:
4/24/2024
SITE APN:
ADD66136
STATUS:
COMPLETED
APPLICANT:
Azhar Mohammed
1100 Business Parkway Suite 195
Richardson TX 75081
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
0
FEE SUMMARY
INSPECTION SUMMARY
REPLACEMENT CARD FEE$10.00
2NDS AND FRAMING 12/08/2022 CMM2$30.00
DRYWALL RES 03/09/2023 CMM2$30.00
FLATWORK RES 03/16/2023 CMM2$30.00
ELECT FINAL RES 08/03/2023 CMM2$30.00
PLAN REVIEW FEE$100.00
PLAN REVIEW FEE$50.00
DRYWALL RES 03/10/2023 DC2$30.00
FLATWORK RES 03/17/2023 DC2$30.00
FLATWORK RES 03/24/2023 DC2$30.00
FLATWORK RES 04/05/2023 DW2$30.00
CREDIT CARD FEE$11.50
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$3.00
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$0.60
PERCENT CREDIT CARD FEE$1.20
PERCENT CREDIT CARD FEE$2.40
PERCENT CREDIT CARD FEE$1.80
PERCENT CREDIT CARD FEE$0.80
PERCENT CREDIT CARD FEE$2.00
PTO AND MECH ROUGH 10/07/2022 GU$30.00
2NDS AND FRAMING 10/28/2022 JDR$30.00
2NDS AND FRAMING 12/30/2022 JDR$30.00
2NDS AND FRAMING 10/27/2022 JWE2$30.00
1 INCH PD METER$450.00
WATER METER DEPOSIT$125.00
PTO AND MECH ROUGH 09/20/2022 MLM$30.00
PTO AND MECH ROUGH 09/30/2022 MLM$30.00
PLUMB MECH FINAL 09/25/2023 MLM$30.00
REPLACEMENT CARD FEE$10.00
AUTO PROCESSING FEE$6.00
FENCE FEE$20.00
RESIDENTIAL NEW PERMIT FEE$2,262.28
RESIDENTIAL FEE$207.03
RESIDENTIAL MECHANICAL FEE$198.50
RESIDENTIAL NEW APPLICATION FEE$300.00
RESIDENTIAL PLUMBING FEE$349.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
AUTO PROCESSING FEE$62.74
AUTO PROCESSING FEE$1.20
T-POLE RES 11/24/2021 RWK$30.00
ELECT RELEASE RES 07/28/2023 RWK$30.00
ELECT RELEASE RES 08/01/2023 RWK$30.00
SLAB RES 12/06/2021 RWT$30.00
PTO AND MECH ROUGH 10/19/2022 SME2$30.00
PTO AND MECH ROUGH 07/19/2022 SMH$30.00
UTILITIES INSPECTION 09/26/2023 TL$100.00
Total Fees:$4,908.05
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE RES
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB RES
______  SLAB RES
______  T-POLE RES
______  ELECT ROUGH RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  ELECT ROUGH RES
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  PTO AND MECH ROUGH
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  2NDS AND FRAMING
______  INSULATION RES
______  INSULATION RES
______  LATH RES
______  DRYWALL RES
______  DRYWALL RES
______  DRYWALL RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  FLATWORK RES
______  ELECT RELEASE RES
______  ELECT RELEASE RES
______  ELECT FINAL RES
______  ELECT RELEASE RES
______  ELECT FINAL RES
______  PLUMB MECH FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  PLUMB MECH FINAL
______  PLUMB MECH FINAL
______  UTILITIES INSPECTION
______  PLUMB MECH FINAL
______  CO AND BUILD FINAL
______  UTILITIES INSPECTION
______  CO AND BUILD FINAL
______  CO AND BUILD FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)