|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/23/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-03991
|
JOB ADDRESS: 9782 POLK ST FRISCO, 75035 |
DESC:
2438 AC, 3003 SF, 2 STORY |
|
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 8/23/2021
APPLIED DATE:8/19/2021
EXPIRED DATE:9/10/2023
SITE APN:ADD267480
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
2NDS AND FRAMING 05/25/2022 DC2 | $30.00 |
PLAN REVIEW FEE | $10.00 |
2NDS AND FRAMING 06/06/2022 DW2 | $30.00 |
2NDS AND FRAMING 06/16/2022 DW2 | $30.00 |
ELECT FINAL RES 01/09/2023 DWF | $30.00 |
CREDIT CARD FEE | $2.00 |
PERCENT CREDIT CARD FEE | $2.40 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $2.20 |
PERCENT CREDIT CARD FEE | $0.60 |
PERCENT CREDIT CARD FEE | $2.00 |
GAS RELEASE 12/21/2022 MLM | $30.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,061.02 |
RESIDENTIAL FEE | $90.09 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $207.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
FLATWORK RES 01/13/2023 PJF | $30.00 |
PTO AND MECH ROUGH 05/06/2022 SDC | $30.00 |
GAS RELEASE 12/09/2022 SME2 | $50.00 |
UTILITIES INSPECTION 02/20/2023 TL | $100.00 |
SERVICE MOVE FAIL | $100.00 |
Total Fees: | $5,216.01 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ GAS RELEASE |
______ 2NDS AND FRAMING |
______ GAS RELEASE |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ FLATWORK RES |
______ FLATWORK RES |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|