|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/17/2021
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B21-03786
|
JOB ADDRESS: 9728 POLK ST FRISCO, 75035 |
DESC:
2438 AC, 3003 SF, 2 STORY |
|
|
CONTRACTOR:
MEGATEL HOMES INC
2101 Cedar Springs Rd #700 Dallas TX 75201
|
ISSUED DATE: 8/17/2021
APPLIED DATE:8/13/2021
EXPIRED DATE:8/15/2023
SITE APN:ADD267477
STATUS:COMPLETED
|
|
APPLICANT:
Hannah Rodgers
2101 Cedar Springs Rd #700 Dallas TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 0
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $450.00 |
WATER METER DEPOSIT | $125.00 |
PLAN REVIEW FEE | $10.00 |
PERCENT CREDIT CARD FEE | $0.20 |
PERCENT CREDIT CARD FEE | $13.80 |
PERCENT CREDIT CARD FEE | $0.60 |
PLUMB MECH FINAL 01/26/2023 MLM | $30.00 |
AUTO PROCESSING FEE | $0.00 |
FENCE FEE | $20.00 |
RESIDENTIAL NEW PERMIT FEE | $1,061.02 |
RESIDENTIAL FEE | $90.09 |
RESIDENTIAL MECHANICAL FEE | $139.50 |
RESIDENTIAL NEW APPLICATION FEE | $300.00 |
RESIDENTIAL PLUMBING FEE | $207.00 |
SEWER IMPACT FEE | $2,344.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
2NDS AND FRAMING 08/01/2022 RWK | $30.00 |
2NDS AND FRAMING 08/10/2022 RWK | $30.00 |
2NDS AND FRAMING 09/01/2022 RWK | $30.00 |
UTILITIES INSPECTION 01/18/2023 TL | $100.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
Total Fees: | $5,481.21 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE RES |
______ PLUMBING ROUGH-IN |
______ SLAB RES |
______ PTO AND MECH ROUGH |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ 2NDS AND FRAMING |
______ INSULATION RES |
______ DRYWALL RES |
______ BRICKWALL TIES RES |
______ FLATWORK RES |
______ GAS RELEASE |
______ ELECT FINAL RES |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMB MECH FINAL |
______ UTILITIES INSPECTION |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ PLUMB MECH FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
______ CO AND BUILD FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|